1. As per Indian Standard Specifications, the peak discharge for domestic purposes per capita per minute, is taken
2. Pick up the item of work not included in the plinth area estimate
3. The brick work is measured in sq metre, in case of
4. Brick walls are measured in sq. m if the thickness of the wall is
5. Pick up the correct statement in case of water supply.
6. In case of laying gullies, siphons, intercepting traps, the cost includes
7. In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and
8. The height of the sink of wash basin above floor level is kept
9. While preparing a detailed estimate
10. Pick up the incorrect statement regarding a master trap from the following :
11. The concrete work for the following part of the building of specified thickness is measured in square metres
12. The expected out turn of cement concrete 1 : 2 : 4 per mason per day is
13. The area of the cross-section of a road fully in banking shown in the given figure, is
14. The plinth area of a building not includes
15. For 12 mm thick cement plastering 1 : 6 on 100 sq.m new brick work, the quantity of cement required, is
16. The minimum width of a septic tank is taken
17. The item of the brick structure measured in sq.m, is
18. The inspection pit or chamber is a manhole provided in a base drainage system
19. In the mid-section formula
20. The item of steel work which is measured in sq.m, is
21. The value of 'C' of Indian type W.C. shown in the given figure is :
22. The area of a sloping surface of a protective embankment of mean height d, side slopes S : 1 and length L is
23. If the formation level of a highway has a uniform gradient for a particular length, and the ground is also having a longitudinal slope, the earthwork may be calculated by
24. The most reliable estiamte is
25. The expected out turn of 12 mm plastering with cement mortar is