Warning: implode(): Invalid arguments passed in /www/wwwroot/jobquiz.info/mdiscuss.php on line 336
Dry period in cattle is about ---------days. ?->(Show Answer!)
Question Set

1. Dry period in cattle is about ---------days.





Ask Your Doubts Here

Type in
(Press Ctrl+g to toggle between English and the chosen language)

Comments

Show Similar Question And Answers
QA->P and Q can do a work in 30 days. Q and R can do the same work in 24 days and R and P in 20 days. They started the work together, but Q and R left after 10 days. How many days more will P take to finish the work?....
QA->P can do a work in 24 days. Q can do the same work in 9 days and R can do the same in 12 days. Q and R start the work and leave after 3 days. P finishes the remaining work in --- days.....
QA->Anil can lay railway track between two stations in 16 days. Subin can do the same job in 12 days. With the help of Jyothi, they completes the job in 4 days. How much days does it take for jyothi alone to complete the work?....
QA->P and Q can complete a work in 15 days and 10 days respectively. They started the work together and then Q left after 2 days. P alone completed the remaining work. The work was finished in --- days.....
QA->A and B can finish a work 30 days if they work together. They worked together for 20 days and then B left. A finished the remaining work in another 20 days. In how many days A alone can finish the work?....
MCQ->In a laboratory test run, the rate of drying was found to be 0.5 x 10-3 kg/m2.s, when the moisture content reduced from 0.4 to 0.1 on dry basis. The critical moisture content of the material is 0.08 on a dry basis. A tray dryer is used to dry 100 kg (dry basis) of the same material under identical conditions. The surface area of the material is 0.04 m2/kg of dry solid. The time required (in seconds) to reduce the moisture content of the solids from 0.3 to 0.2 (dry basis) is....
MCQ->200 kg of solids (on dry basis) is subjected to a drying process for a period of 5000 seconds. The drying occurs in the constant rate period with the drying rate as, Nc = 0.5 x 10-3 kg/m2.s. The initial moisture content of the solid is 0.2 kg moisture/kg dry solid. The interfacial area available for drying is 4 m2/1000 kg of dry solid. The moisture content at the end of the drying period is (in kg moisture/kg dry solid)....
MCQ->Statement : Minute traces of nitrate sometimes present in cattle fodder B may be responsible for the poor health of the cattle therefore use fodder G to ensure that your cattle remain healthy. Assumptions : Cattle fodder G does not contain nitrate Nitrate is toxic to all living beings.....
MCQ->Cloudy days tend to be more windy than sunny days. Foggy days tend to be less windy than cloudy days. Sunny days tend to be less windy than foggy days. If the first two statements are true, the third statement is....
MCQ->A and B can do a piece of work in 30 days, while B and C can do the same work in 24 days and C and A in 20 days. They all work together for 10 days when B and C leave. How many days more will A take to finish the work?....
Terms And Service:We do not guarantee the accuracy of available data ..We Provide Information On Public Data.. Please consult an expert before using this data for commercial or personal use | Powered By:Omega Web Solutions
© 2002-2017 Omega Education PVT LTD...Privacy | Terms And Conditions
Question ANSWER With Solution