Toggle navigation
Home
KPSC Previous Question Papers
Article Category
kerala psc
upsc
General
Popular Pages
Multiple Choice Question in aptitude-area
Multiple Choice Question in non-verbal-reasoning-grouping-of-images
Multiple Choice Question in aptitude-compound-interest
Multiple Choice Question in engineering-mechanics-kinetics-of-a-particle-impulse-and-momentum
Multiple Choice Question in electronic-devices-bipolar-junction-transistors
Multiple Choice Question in 035/2016
Multiple Choice Question in database-database-redesign
Question Answer in malayalam-kerala-psc-questions
Multiple Choice Question in malayalam-kerala-psc-questions
Multiple Choice Question in current-affairs-2017-03-05
Question Answer in KERALA PSC
Multiple Choice Question in KERALA PSC
Question Answer Bank
Multiple Choice Question Bank
Question Answer Category
Multiple Choice Question Category
Home
->
Question Answer Bank
1. 15. Up to time
Answer:
Previous Question
Next Question
Add Tags
Report Error
Reply
Type in
(Press Ctrl+g to toggle between English and the chosen language)
Post reply
Comments
Tags
Idioms-and-Phrases
Show Similar Question And Answers
QA->P takes twice as much time as Q or thrice as much time as R to finish a piece of work. They can finish the work in 2 days if work together. How much time will Q take to do the work alone?....
QA->The time of Cairo is hours ahead of Greenwich time. Cairo is situated at which degree?....
QA->49. Time after time....
QA->From time to time....
QA->When a proclamation of national emergency is in force, the term of Lok Sabha can be extended by Parliament for the first time for a period not exceeding ...... at a time?....
MCQ->Consider the following statements: For a master-slave J-K flip-flop, the toggle frequency is the maximum clock frequency at which the flip-flop will toggle reliably.the data input must precede the clock triggering edge transition time by time minimum time.the data input must remain fixed for a given time after, the clock triggering edge transition time for reliable operation.propagation delay time is equal to the rise time and fall time of the data. Which of the above statements is/are correct?...
MCQ->Consider the following statements : Total flat is : 1. the time span by which the starting (or finishing) of an activity can be delayed without delaying the completion of the project. 2. difference between maximum time available and the actual time required to perform the activity. 3. difference between its earliest finish time and the earliest start time of its successor activity. Which among the following is/are correct ?...
MCQ->Consider 49 cascaded amplifiers having individual rise time as 2 n sec. 3 n sec. ... 50 n sec. The input waveform rise time is 1 n sec. Then the output signal rise time is given time by (Assume output signal rise time is measured within 10 percent range of the final output signal.)...
MCQ->Which of the following statements are correct about inspecting an attribute in C#.NET? An attribute can be inspected at link-time. An attribute can be inspected at compile-time. An attribute can be inspected at run-time. An attribute can be inspected at design-time....
MCQ->Suppose that the gain, time constant and dead time of a process with the following transfer function:Gc(s) = 10 exp( - 0.1s)/(0.5s + 1) are known with a possible error of ± 20% of their values. The largest permissible gain Kc of a proportional controller needs to be calculated below taking the values of process gain, time constant and dead time as...
×
×
Type The Issue