Toggle navigation
Home
KPSC Previous Question Papers
Article Category
kerala psc
upsc
General
Popular Pages
Multiple Choice Question in engineering-mechanics-kinetics-of-a-particle-impulse-and-momentum
Multiple Choice Question in database-database-redesign
Multiple Choice Question in current-affairs-2017-03-05
Question Answer in malayalam-kerala-psc-questions
Multiple Choice Question in malayalam-kerala-psc-questions
Question Answer in kerala-psc-questions-in-malayalam
Multiple Choice Question in kerala-psc-questions-in-malayalam
Multiple Choice Question in electronics-and-communication-engineering-electronic-devices-and-circuits
Multiple Choice Question in database-sql-for-database-construction-and-application-processing
Multiple Choice Question in 035/2016
Question Answer in KERALA PSC
Multiple Choice Question in KERALA PSC
Multiple Choice Question in 025/2016
Question Answer Bank
Multiple Choice Question Bank
Question Answer Category
Multiple Choice Question Category
Home
->
Multiple Choice Questions
Question Set
1. A large tank filled with water is to be emptied by removing 1/5th of the water present in it everyday.After how many days will there be closest to 25% of the water left in the tank
(A): 3rd day
(B): 5th day
(C): 6th day
(D): 7th day
Previous Question
Show Answer
Next Question
Add Tags
Report Error
Show Marks
Ask Your Doubts Here
Type in
(Press Ctrl+g to toggle between English and the chosen language)
Post reply
Comments
Show Similar Question And Answers
QA->P and Q can do a work in 30 days. Q and R can do the same work in 24 days and R and P in 20 days. They started the work together, but Q and R left after 10 days. How many days more will P take to finish the work?....
QA->P and Q can complete a work in 15 days and 10 days respectively. They started the work together and then Q left after 2 days. P alone completed the remaining work. The work was finished in --- days.....
QA->A and B can finish a work 30 days if they work together. They worked together for 20 days and then B left. A finished the remaining work in another 20 days. In how many days A alone can finish the work?....
QA->P can finish a work in 18 days. Q can finish the same work in 15 days. Q worked for 10 days and left the job. How many days does P alone need to finish the remaining work?....
QA->P can do a work in 24 days. Q can do the same work in 9 days and R can do the same in 12 days. Q and R start the work and leave after 3 days. P finishes the remaining work in --- days.....
MCQ->A large tank filled with water is to be emptied by removing 1/5th of the water present in it everyday.After how many days will there be closest to 25% of the water left in the tank....
MCQ->A tank is filled by three pipes with uniform flow. The first two pipes operating simultaneously fill the tank in the same time during which the tank is filled by the third pipe alone. The second pipe fills the tank 5 hours faster than the first pipe and 4 hours slower than the third pipe. The time required by the first pipe is:....
MCQ->A and B are two taps which can fill a tank individually in 10 minutesand 20 minutes respectively. However, there is a leakage at the bottom which can empty a filled tank in 40 minutes. If the tank is empty initially, how much time will both the taps take to fill the tank (leakage is still there) ?....
MCQ->A tank is filled with ¾ part of it with water.If 5 litre of water is added to it,the tank is filled with 4/5 part of it.What is the capacity of the tank?....
MCQ->A and B can together finish a work 30 days. They worked together for 20 days and then B left. After another 20 days, A finished the remaining work. In how many days A alone can finish the work?....
×
×
Type The Issue
×
Your Marks
Terms And Service:We do not guarantee the accuracy of available data ..We Provide Information On Public Data.. Please consult an expert before using this data for commercial or personal use | Powered By:Omega Web Solutions
© 2002-2017 Omega Education PVT LTD...
Privacy
|
Terms And Conditions
Question ANSWER With Solution