1. It takes 6 hours to dry a wet solid from 50% moisture content to the critical moisture content of 15%. How much longer it will take to dry the solid to 10% moisture content, under the same drying conditions? (The equilibrium moisture content of the solid is 5%).





Ask Your Doubts Here

Type in
(Press Ctrl+g to toggle between English and the chosen language)

Comments

Show Similar Question And Answers
QA->A can do a piece of work in 4 hours . A and C together can do it in just 2 hours, while B and C together need 3 hours to finish the same work. B alone can complete the work in --- hours.....
QA->P takes twice as much time as Q or thrice as much time as R to finish a piece of work. They can finish the work in 2 days if work together. How much time will Q take to do the work alone?....
QA->Raj can do a piece of work in 5 hours. Hari and Siva can do it in 3 hours. Raj and Siva can do it in 4 hours. How long will Hari take to do it ?....
QA->Raj can do a piece of work in 5 hours. Hari and Siva can do it in 3 hours. Raj and Siva can do it in 4 hours. How long will Hari take to do it ?....
QA->A can do a piece of work in 4 hours . A and C together can do it in just 2 hours, while B and C together need 3 hours to finish the same work. B alone can complete the work in --- days.....
MCQ->It takes 6 hours to dry a wet solid from 50% moisture content to the critical moisture content of 15%. How much longer it will take to dry the solid to 10% moisture content, under the same drying conditions? (The equilibrium moisture content of the solid is 5%).....
MCQ->200 kg of solids (on dry basis) is subjected to a drying process for a period of 5000 seconds. The drying occurs in the constant rate period with the drying rate as, Nc = 0.5 x 10-3 kg/m2.s. The initial moisture content of the solid is 0.2 kg moisture/kg dry solid. The interfacial area available for drying is 4 m2/1000 kg of dry solid. The moisture content at the end of the drying period is (in kg moisture/kg dry solid)....
MCQ->A solid is being dried in the linear drying rate regime from moisture content Xo to XF. The drying rate is zero at X = 0 and the critical moisture content is the same as the initial moisture Xo. The drying time for M = (Ls/ARc) is (where, L = total mass of dry solid, A = total surface area for drying Rc = Constant maximum drying rate per unit area X = moisture content (in mass of water/mass of dry solids))....
MCQ->In a laboratory test run, the rate of drying was found to be 0.5 x 10-3 kg/m2.s, when the moisture content reduced from 0.4 to 0.1 on dry basis. The critical moisture content of the material is 0.08 on a dry basis. A tray dryer is used to dry 100 kg (dry basis) of the same material under identical conditions. The surface area of the material is 0.04 m2/kg of dry solid. The time required (in seconds) to reduce the moisture content of the solids from 0.3 to 0.2 (dry basis) is....
MCQ->A 25 cm x 25 cm x 1 cm flat sheet weighing 1.2 kg initially was dried from both sides under constant drying rate conditions. It took 1500 seconds for the weight of the sheet to reduce to 1.05 kg. Another 1m x 1m x 1cm flat sheet of the same material is to be dried from one side only.Under the same constant drying rate conditions, the time required for drying (in seconds) from its initial weight of 19.2 kg to 17.6 kg is....