1. The pile which is provided with a bulb filled with concrete at its lower end, is known as






Ask Your Doubts Here

Type in
(Press Ctrl+g to toggle between English and the chosen language)

Comments

Show Similar Question And Answers
QA->Which is the gas usually filled in the electric bulb?....
QA->The gas usually filled in the electric bulb is?....
QA->The quantity of water in a cistern doubles every minute. It gets filled in 60 minutes. In how many minutes will it be half - filled?....
QA->In a row of girls A is 11th from one end and 7th from the other end. How many girls are there in the row.....
QA->In a row of 16 boys, when Ram moves two places towards left, he becomes 7th from the left end. What was his earlier position from right end of the row ?....
MCQ->Consider the following statements pertaining to a pile group and a single pile at failure : 1. In loose and medium dense sands, the failure load per pile in a group will generally be greater than the failure load for a single pile. 2. In cohesive soils, the failure load per pile in a group will be greater than failure load for a single pile. 3. For piles driven in dense sands, the failure load per pile in a group is greater than the failure load for a single pile. 4. When the pile spacing is greater than 10 times the pile diameter, the failure loads per pile in a group and forly same in both sands and clays. Of these statements :....
MCQ->The pile which is provided with a bulb filled with concrete at its lower end, is known as....
MCQ->Consider the following field tests : 1. Vertical pile load test 2. Cyclic pile load test 3. Lateral pile load test 4. Instrumented test pile While estimating the load carrying capacity of a pile, the tests that can be used for separating the skin resistance from point resistance, would include....
MCQ->Two piles, one a bored cast-in-situ pile and another a precast driven pile, both of same length and diameter are constructed in a loose sand deposit. If the bearing capacity of the bored pile is Q1, and that of the precast driven pile is Q2, then which of the following is correct ?....
MCQ->The wet bulb temperature is lower in dry air than in wet air at the same temperature. A dry bulb thermometer registers a higher temperature than a wet bulb thermometer except at __________ percent relative humidity.....
Terms And Service:We do not guarantee the accuracy of available data ..We Provide Information On Public Data.. Please consult an expert before using this data for commercial or personal use | Powered By:Omega Web Solutions
© 2002-2017 Omega Education PVT LTD...Privacy | Terms And Conditions
Question ANSWER With Solution