1. After casting, an ordinary cement concrete on drying





Ask Your Doubts Here

Type in
(Press Ctrl+g to toggle between English and the chosen language)

Comments

Show Similar Question And Answers
QA->A man started to walk East. After moving a distance he turned to his right. After moving a distance he turned to his right again. After moving a little he turned in the end of his left. In which direction he going is now?....
QA->Long distance short-wave radio broad casting uses which waves?....
QA->The Travancore State Broad casting station was started on?....
QA->Name the alloy used for casting engine parts?....
QA->An ordinary clock loses time in summer. This is because:?....
MCQ->200 kg of solids (on dry basis) is subjected to a drying process for a period of 5000 seconds. The drying occurs in the constant rate period with the drying rate as, Nc = 0.5 x 10-3 kg/m2.s. The initial moisture content of the solid is 0.2 kg moisture/kg dry solid. The interfacial area available for drying is 4 m2/1000 kg of dry solid. The moisture content at the end of the drying period is (in kg moisture/kg dry solid)....
MCQ->A solid is being dried in the linear drying rate regime from moisture content Xo to XF. The drying rate is zero at X = 0 and the critical moisture content is the same as the initial moisture Xo. The drying time for M = (Ls/ARc) is (where, L = total mass of dry solid, A = total surface area for drying Rc = Constant maximum drying rate per unit area X = moisture content (in mass of water/mass of dry solids))....
MCQ->After casting, an ordinary cement concrete on drying....
MCQ->Which of the statements regarding to Portland Cement are correct? 1.Silica imparts strength to cement 2.Alumina makes cement quick setting 3.Excess of lime increases strength of cement 4.Calcium sulphate decreases initial setting time of cement Select the correct answer using the code below....
MCQ->A 25 cm x 25 cm x 1 cm flat sheet weighing 1.2 kg initially was dried from both sides under constant drying rate conditions. It took 1500 seconds for the weight of the sheet to reduce to 1.05 kg. Another 1m x 1m x 1cm flat sheet of the same material is to be dried from one side only.Under the same constant drying rate conditions, the time required for drying (in seconds) from its initial weight of 19.2 kg to 17.6 kg is....
Terms And Service:We do not guarantee the accuracy of available data ..We Provide Information On Public Data.. Please consult an expert before using this data for commercial or personal use | Powered By:Omega Web Solutions
© 2002-2017 Omega Education PVT LTD...Privacy | Terms And Conditions
Question ANSWER With Solution