Toggle navigation
Home
KPSC Previous Question Papers
Article Category
kerala psc
upsc
General
Popular Pages
Multiple Choice Question in aptitude-area
Multiple Choice Question in non-verbal-reasoning-grouping-of-images
Multiple Choice Question in aptitude-compound-interest
Multiple Choice Question in engineering-mechanics-kinetics-of-a-particle-impulse-and-momentum
Multiple Choice Question in database-database-redesign
Multiple Choice Question in 035/2016
Question Answer in malayalam-kerala-psc-questions
Multiple Choice Question in malayalam-kerala-psc-questions
Multiple Choice Question in current-affairs-2017-03-05
Question Answer in KERALA PSC
Multiple Choice Question in KERALA PSC
Multiple Choice Question in electronic-devices-bipolar-junction-transistors
Question Answer Bank
Multiple Choice Question Bank
Question Answer Category
Multiple Choice Question Category
Home
->
Multiple Choice Questions
Question Set
civil engineering construction management
1. For the supply of materials for concrete, form work reinforcing and placing of concrete, removal of form work and curing of concrete, number of bar(s) required on bar chart, is
(A): 1
(B): 2
(C): 3
(D): 4
Previous Question
Show Answer
Next Question
Add Tags
Report Error
Show Marks
Ask Your Doubts Here
Type in
(Press Ctrl+g to toggle between English and the chosen language)
Post reply
Comments
Show Similar Question And Answers
QA->P and Q can do a work in 30 days. Q and R can do the same work in 24 days and R and P in 20 days. They started the work together, but Q and R left after 10 days. How many days more will P take to finish the work?....
QA->P and Q can complete a work in 15 days and 10 days respectively. They started the work together and then Q left after 2 days. P alone completed the remaining work. The work was finished in --- days.....
QA->P and Q can complete a work in 20 days and 12 days respectively. P alone started the work and Q joined him after 4 days till the completion of the work. How long did the work last?....
QA->P can do a work in 24 days. Q can do the same work in 9 days and R can do the same in 12 days. Q and R start the work and leave after 3 days. P finishes the remaining work in --- days.....
QA->P can do a work in the same time in which Q and R together can do it. If P and Q work together, the work can be completed in 10 days. R alone needs 50 days to complete the same work. then Q alone can do it in....
MCQ->For the supply of materials for concrete, form work reinforcing and placing of concrete, removal of form work and curing of concrete, number of bar(s) required on bar chart, is....
MCQ->Pick up the correct network for the activities of pouring concrete, erection of form work, removal of form work and curing of concrete from the following:....
MCQ->class Bar { } class Test { Bar doBar() { Bar b = new Bar(); / Line 6 / return b; / Line 7 / } public static void main (String args[]) { Test t = new Test(); / Line 11 / Bar newBar = t.doBar(); / Line 12 / System.out.println("newBar"); newBar = new Bar(); / Line 14 / System.out.println("finishing"); / Line 15 / } } At what point is the Bar object, created on line 6, eligible for garbage collection?....
MCQ->Consider the following statements : Curing of concrete is necessary because (a) concrete needs more water for chemical reaction (b) it is necessary to protect the water initially mixed in concrete from being lost during evaporation (c) penetration of surrounding water increases the strength of concrete Which of the statements given above is/are correct ?....
MCQ->What will be the output of the program? public class Foo { Foo() { System.out.print("foo"); } class Bar { Bar() { System.out.print("bar"); } public void go() { System.out.print("hi"); } } / class Bar ends / public static void main (String [] args) { Foo f = new Foo(); f.makeBar(); } void makeBar() { (new Bar() {}).go(); } }/ class Foo ends /....
×
×
Type The Issue
×
Your Marks
Terms And Service:We do not guarantee the accuracy of available data ..We Provide Information On Public Data.. Please consult an expert before using this data for commercial or personal use | Powered By:Omega Web Solutions
© 2002-2017 Omega Education PVT LTD...
Privacy
|
Terms And Conditions
Question ANSWER With Solution