1. The project contractor relies on the cost of the estimate :





Ask Your Doubts Here

Type in
(Press Ctrl+g to toggle between English and the chosen language)

Comments

Show Similar Question And Answers
QA->Assume that 20 cows and 40 goats can be kept for 10 days for Rs. If the cost of keeping 5 goats is the same as the cost of keeping 1 cow, what will be the cost for keeping 50 cows and 30 goats for 12 days?....
QA->As per the revised estimate of CSO, the GDP in India at factor cost during 2008-09 was—....
QA->A trader marks an article at 30% more than the cost price. He gives 10% discount to his customers and gains Rs. 25·50 per article. The cost price of the article is—....
QA->At which place in Jharkhand, Prime Minister Narendra Modi dedicated to nation the second Multi Modal Terminal constructed on the river Ganga and built at a cost of 290 crores under Jal Marg ₹ Vikas Project (JMVP)?....
QA->By whom was the first estimate of national income in India made?....
MCQ->The project contractor relies on the cost of the estimate :....
MCQ->Chemical engineering plant cost index is used for finding the present cost of a particular chemical plant, if the cost of similar plant at some time in the past is known. the present cost of the plant = Original cost [index value at present / index value at the time of original cost was obtained] The most major component of this cost index is....
MCQ->Chemical engineering plant cost index is used for finding the present cost of a particular chemical plant, if the cost of similar plant at some time in the past is known. The present cost of the plant = original cost   x The most major component of this cost index is....
MCQ->In a shop 9 oranges cost as much as 5 apples, 5 apples cost as much as 3 mangoes, 3 mangoes cost as much as 12 lemons. If the cost of 12 lemons is Rs. 18, the cost of an orange is....
MCQ->Two alternatives can produce a product. First has a fixed cost of Rs. 2000 and a variable cost of Rs. 20 per piece. The second method has a fixed cost of Rs. 1500 and a variable cost of Rs. 30. The break even quantity between the two alternatives is....