Toggle navigation
Home
KPSC Previous Question Papers
Article Category
kerala psc
upsc
General
Popular Pages
Multiple Choice Question in engineering-mechanics-kinetics-of-a-particle-impulse-and-momentum
Multiple Choice Question in database-database-redesign
Question Answer in malayalam-kerala-psc-questions
Multiple Choice Question in malayalam-kerala-psc-questions
Multiple Choice Question in current-affairs-2017-03-05
Question Answer in kerala-psc-questions-in-malayalam
Multiple Choice Question in kerala-psc-questions-in-malayalam
Multiple Choice Question in electronics-and-communication-engineering-electronic-devices-and-circuits
Multiple Choice Question in database-sql-for-database-construction-and-application-processing
Multiple Choice Question in 035/2016
Question Answer in Antonyms
Question Answer in KERALA PSC
Multiple Choice Question in KERALA PSC
Question Answer Bank
Multiple Choice Question Bank
Question Answer Category
Multiple Choice Question Category
Home
->
Multiple Choice Questions
Question Set
civil engineering engineering economy
1. The project contractor relies on the cost of the estimate :
(A): All of these
(B): for a unit price contract
(C): for preparation of a definitive estimate to help negotiate contract.
(D): for submission of a competitive bid for a lumpsum contract
Previous Question
Show Answer
Next Question
Add Tags
Report Error
Show Marks
Ask Your Doubts Here
Type in
(Press Ctrl+g to toggle between English and the chosen language)
Post reply
Comments
Show Similar Question And Answers
QA->Assume that 20 cows and 40 goats can be kept for 10 days for Rs. If the cost of keeping 5 goats is the same as the cost of keeping 1 cow, what will be the cost for keeping 50 cows and 30 goats for 12 days?....
QA->As per the revised estimate of CSO, the GDP in India at factor cost during 2008-09 was—....
QA->A trader marks an article at 30% more than the cost price. He gives 10% discount to his customers and gains Rs. 25·50 per article. The cost price of the article is—....
QA->At which place in Jharkhand, Prime Minister Narendra Modi dedicated to nation the second Multi Modal Terminal constructed on the river Ganga and built at a cost of 290 crores under Jal Marg ₹ Vikas Project (JMVP)?....
QA->By whom was the first estimate of national income in India made?....
MCQ->The project contractor relies on the cost of the estimate :....
MCQ->Chemical engineering plant cost index is used for finding the present cost of a particular chemical plant, if the cost of similar plant at some time in the past is known. the present cost of the plant = Original cost [index value at present / index value at the time of original cost was obtained] The most major component of this cost index is....
MCQ->Chemical engineering plant cost index is used for finding the present cost of a particular chemical plant, if the cost of similar plant at some time in the past is known. The present cost of the plant = original cost x The most major component of this cost index is....
MCQ->In a shop 9 oranges cost as much as 5 apples, 5 apples cost as much as 3 mangoes, 3 mangoes cost as much as 12 lemons. If the cost of 12 lemons is Rs. 18, the cost of an orange is....
MCQ->Two alternatives can produce a product. First has a fixed cost of Rs. 2000 and a variable cost of Rs. 20 per piece. The second method has a fixed cost of Rs. 1500 and a variable cost of Rs. 30. The break even quantity between the two alternatives is....
×
×
Type The Issue
×
Your Marks
Terms And Service:We do not guarantee the accuracy of available data ..We Provide Information On Public Data.. Please consult an expert before using this data for commercial or personal use | Powered By:Omega Web Solutions
© 2002-2017 Omega Education PVT LTD...
Privacy
|
Terms And Conditions
Question ANSWER With Solution