Toggle navigation
Home
KPSC Previous Question Papers
Article Category
kerala psc
upsc
General
Popular Pages
Multiple Choice Question in aptitude-area
Multiple Choice Question in non-verbal-reasoning-grouping-of-images
Multiple Choice Question in aptitude-compound-interest
Multiple Choice Question in engineering-mechanics-kinetics-of-a-particle-impulse-and-momentum
Multiple Choice Question in database-database-redesign
Multiple Choice Question in 035/2016
Question Answer in malayalam-kerala-psc-questions
Multiple Choice Question in malayalam-kerala-psc-questions
Multiple Choice Question in current-affairs-2017-03-05
Question Answer in KERALA PSC
Multiple Choice Question in KERALA PSC
Multiple Choice Question in electronic-devices-bipolar-junction-transistors
Question Answer Bank
Multiple Choice Question Bank
Question Answer Category
Multiple Choice Question Category
Home
->
Multiple Choice Questions
Question Set
civil engineering gate exam questions
1. The proposed dam shown in the below figure is 90 m long and coefficient of permeability of the soil is 0.0013 mm/second. The quantity of water (m3) that will be lost per day, by seepage is (rounded to the nearest number):
(A): 55
(B): 57
(C): 59
(D): 61
Previous Question
Show Answer
Next Question
Add Tags
Report Error
Show Marks
Ask Your Doubts Here
Type in
(Press Ctrl+g to toggle between English and the chosen language)
Post reply
Comments
Show Similar Question And Answers
QA->As per the revised Goods and Services Tax (GST) norms, the GST on Haj and Kailash Mansarovar Yatra has been reduced from 18 per cent to how much per cent?....
QA->A can complete a work in 12 days with a working of 8 hours per day. B can complete the same work in 8 days when working 10 hours a day. If A and B work together, working 8 hours a day, the work can be completed in --days.....
QA->If the central portion of a convex lens is wrapped in black paper as shown in the figure?....
QA->There is a group of persons each of whom can complete a piece of work in 16 days, when they are working individually. On the first day one person works, on the second day another person joins him, on the third day one more person joins them and this process continues till the work is completed. How many days are needed to complete the work?....
QA->A train 110ms long passes a telegraph pole in 3 seconds. How long will it take to cross railway platform 165 ms long....
MCQ->The proposed dam shown in the below figure is 90 m long and coefficient of permeability of the soil is 0.0013 mm/second. The quantity of water (m3) that will be lost per day, by seepage is (rounded to the nearest number): ....
MCQ->A flownet constructed to determine the seepage through an earth dam which is homogeneous but anisotropic, gave four flow channels and sixteen equipotential drops. The coefficients of permeability in the horizontal and vertical directions are 4 x 10-7 m/s and 1.0 x 10-7 m/s, respectively. If the storage head was 20 m, then the seepage per unit length of the dam (in m3/s) would be....
MCQ->A flownet for an earth dam on impervious foundation consists of 4 flow channels and 15 equipotential drops. The full reservoir level is 15 m above the downstream horizontal filter. Given that horizontal permeability is 9 x 10-6 m/s and vertical permeability is 1 x 10-6 m/s, the quantity of seepage through the dam will be....
MCQ->For a homogeneous earth dam 50 m high having 2 m free broad, a flow net was constructed and the results were : Number of potential drops = 2.4 Number of flow channels = 0.4. If coefficiency of permeability of the dam mateiral is 3 x 10-3 cm3/sec, the discharge per metre length of dam, is....
MCQ->In a three-layered soil, water flows parallel to stratification. The thickness of the middle layer is twice that of top and bottom layer. The coefficient of permeability of middle layer (2K) is twice that of top and bottom layer (K). What is the average coefficient of permeability for this flow ?....
×
×
Type The Issue
×
Your Marks
Terms And Service:We do not guarantee the accuracy of available data ..We Provide Information On Public Data.. Please consult an expert before using this data for commercial or personal use | Powered By:Omega Web Solutions
© 2002-2017 Omega Education PVT LTD...
Privacy
|
Terms And Conditions
Question ANSWER With Solution