Toggle navigation
Home
KPSC Previous Question Papers
Article Category
kerala psc
upsc
General
Popular Pages
Multiple Choice Question in കറന്റ് അഫയേഴ്സ് മേയ് 11
Multiple Choice Question in കറന്റ് അഫയേഴ്സ് - ഏപ്രില് 07
Multiple Choice Question in current-affairs-2016-12-22
Multiple Choice Question in current-affairs-2017-01-22
Multiple Choice Question in biochemistry-structure-and-properties-of-peptides
Multiple Choice Question in കറന്റ് അഫയേഴ്സ് - ക്വിസ് | ഡിസംബര് 05 - 12
Multiple Choice Question in biochemical-engineering-fluid-flow
Multiple Choice Question in biochemistry-allosteric-effects
Multiple Choice Question in current-affairs-2017-05-07
Multiple Choice Question in കറന്റ് അഫയേഴ്സ് മേയ് 26
Question Answer Bank
Multiple Choice Question Bank
Question Answer Category
Multiple Choice Question Category
Home
->
Multiple Choice Questions
Question Set
civil engineering gate exam questions
1. A borrow pit soil has a dry density of 17 kN/m3. How many cubic meters of this soil will be required to construct an embankment of 100 m3 volume with a dry density of 16 kN/m3.
(A): 100 m3
(B): 106 m3
(C): 90 m3
(D): 94 m3
Previous Question
Show Answer
Next Question
Add Tags
Report Error
Show Marks
Ask Your Doubts Here
Type in
(Press Ctrl+g to toggle between English and the chosen language)
Post reply
Comments
Show Similar Question And Answers
QA->Name the irrigation project which has entered into the Guiness Book of World Records for pouring 32,100 cubic meters of concrete in 24 hours?....
QA->Prabha walks 60 meters in 2 minutes. How many minutes will she take to walk 240 meters?....
QA->How many pieces, each the length of 5 meters, can be cut out from 225 meters of a wire?....
QA->The length of a rectangular field is 50 meters and the breadth is 25 meters. What will be the cost of putting a grass bed across....
QA->A train of length 150 meters took 8 seconds to cross a bridge of length 250 meters. Time taken by the train to cross a telephone post is....
MCQ->A borrow pit soil has a dry density of 17 kN/m3. How many cubic meters of this soil will be required to construct an embankment of 100 m3 volume with a dry density of 16 kN/m3.....
MCQ->A fill having a volume of 150, 000 cm is to be constructed at a void ratio of 0.8. The borrow pit soil has a void ratio of 1.4. The volume of soil required (in cubic metres) to be excavated from the borrow pit will be....
MCQ->Kiran walked 78 meters towards North.From there he turned left and walked 35 meters.Thereafter he turned to his left,walked 30 meters,turned right and walked 5 meters again.Next,he turned left and walked 48 meters and stoppeHow far and in which direction is Kiran now from his starting point?....
MCQ->The ground surface slopes 1 in 50 along a proposed railway embankment 150 m in length. The height of the embankment at zero chainage is 0.5 m, the width is 11 m and side slopes 2:1. If the falling gradient of the embankment is 1 in 150, the quantity of the earthwork calculated by prismoidal formula, is....
MCQ->In a laboratory test run, the rate of drying was found to be 0.5 x 10-3 kg/m2.s, when the moisture content reduced from 0.4 to 0.1 on dry basis. The critical moisture content of the material is 0.08 on a dry basis. A tray dryer is used to dry 100 kg (dry basis) of the same material under identical conditions. The surface area of the material is 0.04 m2/kg of dry solid. The time required (in seconds) to reduce the moisture content of the solids from 0.3 to 0.2 (dry basis) is....
×
×
Type The Issue
×
Your Marks
Terms And Service:We do not guarantee the accuracy of available data ..We Provide Information On Public Data.. Please consult an expert before using this data for commercial or personal use | Powered By:Omega Web Solutions
© 2002-2017 Omega Education PVT LTD...
Privacy
|
Terms And Conditions
Question ANSWER With Solution