Toggle navigation
Home
KPSC Previous Question Papers
Article Category
kerala psc
upsc
General
Popular Pages
Multiple Choice Question in engineering-mechanics-kinetics-of-a-particle-impulse-and-momentum
Multiple Choice Question in database-database-redesign
Question Answer in malayalam-kerala-psc-questions
Multiple Choice Question in malayalam-kerala-psc-questions
Multiple Choice Question in current-affairs-2017-03-05
Question Answer in kerala-psc-questions-in-malayalam
Multiple Choice Question in kerala-psc-questions-in-malayalam
Multiple Choice Question in electronics-and-communication-engineering-electronic-devices-and-circuits
Multiple Choice Question in database-sql-for-database-construction-and-application-processing
Multiple Choice Question in 035/2016
Question Answer in Antonyms
Question Answer in KERALA PSC
Multiple Choice Question in KERALA PSC
Question Answer Bank
Multiple Choice Question Bank
Question Answer Category
Multiple Choice Question Category
Home
->
Multiple Choice Questions
Question Set
civil engineering gate exam questions
1. A borrow pit soil has a dry density of 17 kN/m3. How many cubic meters of this soil will be required to construct an embankment of 100 m3 volume with a dry density of 16 kN/m3.
(A): 100 m3
(B): 106 m3
(C): 90 m3
(D): 94 m3
Previous Question
Show Answer
Next Question
Add Tags
Report Error
Show Marks
Ask Your Doubts Here
Type in
(Press Ctrl+g to toggle between English and the chosen language)
Post reply
Comments
Show Similar Question And Answers
QA->Name the irrigation project which has entered into the Guiness Book of World Records for pouring 32,100 cubic meters of concrete in 24 hours?....
QA->Prabha walks 60 meters in 2 minutes. How many minutes will she take to walk 240 meters?....
QA->How many pieces, each the length of 5 meters, can be cut out from 225 meters of a wire?....
QA->The length of a rectangular field is 50 meters and the breadth is 25 meters. What will be the cost of putting a grass bed across....
QA->A train of length 150 meters took 8 seconds to cross a bridge of length 250 meters. Time taken by the train to cross a telephone post is....
MCQ->A borrow pit soil has a dry density of 17 kN/m3. How many cubic meters of this soil will be required to construct an embankment of 100 m3 volume with a dry density of 16 kN/m3.....
MCQ->A fill having a volume of 150, 000 cm is to be constructed at a void ratio of 0.8. The borrow pit soil has a void ratio of 1.4. The volume of soil required (in cubic metres) to be excavated from the borrow pit will be....
MCQ->Kiran walked 78 meters towards North.From there he turned left and walked 35 meters.Thereafter he turned to his left,walked 30 meters,turned right and walked 5 meters again.Next,he turned left and walked 48 meters and stoppeHow far and in which direction is Kiran now from his starting point?....
MCQ->The ground surface slopes 1 in 50 along a proposed railway embankment 150 m in length. The height of the embankment at zero chainage is 0.5 m, the width is 11 m and side slopes 2:1. If the falling gradient of the embankment is 1 in 150, the quantity of the earthwork calculated by prismoidal formula, is....
MCQ->In a laboratory test run, the rate of drying was found to be 0.5 x 10-3 kg/m2.s, when the moisture content reduced from 0.4 to 0.1 on dry basis. The critical moisture content of the material is 0.08 on a dry basis. A tray dryer is used to dry 100 kg (dry basis) of the same material under identical conditions. The surface area of the material is 0.04 m2/kg of dry solid. The time required (in seconds) to reduce the moisture content of the solids from 0.3 to 0.2 (dry basis) is....
×
×
Type The Issue
×
Your Marks
Terms And Service:We do not guarantee the accuracy of available data ..We Provide Information On Public Data.. Please consult an expert before using this data for commercial or personal use | Powered By:Omega Web Solutions
© 2002-2017 Omega Education PVT LTD...
Privacy
|
Terms And Conditions
Question ANSWER With Solution