Toggle navigation
Home
KPSC Previous Question Papers
Article Category
kerala psc
upsc
General
Popular Pages
Multiple Choice Question in കറന്റ് അഫയേഴ്സ് മേയ് 11
Multiple Choice Question in കറന്റ് അഫയേഴ്സ് - ഏപ്രില് 07
Multiple Choice Question in current-affairs-2016-12-22
Multiple Choice Question in current-affairs-2017-01-22
Multiple Choice Question in കറന്റ് അഫയേഴ്സ് - ക്വിസ് | ഡിസംബര് 05 - 12
Multiple Choice Question in biochemistry-structure-and-properties-of-peptides
Multiple Choice Question in biochemical-engineering-fluid-flow
Multiple Choice Question in biochemistry-allosteric-effects
Multiple Choice Question in current-affairs-2017-05-07
Multiple Choice Question in കറന്റ് അഫയേഴ്സ് മേയ് 26
Question Answer Bank
Multiple Choice Question Bank
Question Answer Category
Multiple Choice Question Category
Home
->
Multiple Choice Questions
Question Set
civil engineering irrigation
1. The structure constructed to allow drainage water to flow under pressure through an inverted syphon below a canal, is called
(A): aqueduct
(B): super passage
(C): super-aqueduct
(D): syphon
(E): syphon aqueduct.
Previous Question
Show Answer
Next Question
Add Tags
Report Error
Show Marks
Ask Your Doubts Here
Type in
(Press Ctrl+g to toggle between English and the chosen language)
Post reply
Comments
Show Similar Question And Answers
QA->Substances which allow electricity to flow through them partially?....
QA->One will NOT have to pass through the Suez Canal while going from Bombay to which canal?....
QA->Of the four locations mentioned below the highest inside temperature will be attained in the pressure cooker operated with the pressure valve open?....
QA->Substances which allow light to pass through them are called?....
QA->Substances which does not allow electricity to pass through it is called?....
MCQ->The structure constructed to allow drainage water to flow under pressure through an inverted syphon below a canal, is called....
MCQ->Consider the following statements: An aqueduct is a cross drainage work in which (a) a canal is carried over the drainage channel (b) a drainage channel is carried over the canal (c) both drainage channel and canal are at the same level. Which of the statements given above is/are correct ?....
MCQ->When a canal flowing under pressure is carried below a natural drainage such that its F.S.L. does not touch the underside of the supporting structure, the structure so provided, is called....
MCQ->For loss of head in a canal inverted syphon barrel, the factor in the Unwin formula is a coefficient for loss of head due to....
MCQ->The following tunnels were constructed in different countries for different purposes : 1. Emperor Claudius built the first Roman tunnel 2. The first highway tunnel was constructed in Hungary 3. The first underground railway tunnel was constructed in Great Britain 4. The first navigational tunnel was constructed in France. The correct chronological development of these tunnels is:....
×
×
Type The Issue
×
Your Marks
Terms And Service:We do not guarantee the accuracy of available data ..We Provide Information On Public Data.. Please consult an expert before using this data for commercial or personal use | Powered By:Omega Web Solutions
© 2002-2017 Omega Education PVT LTD...
Privacy
|
Terms And Conditions
Question ANSWER With Solution