1. The run off a drainage basin is





Ask Your Doubts Here

Type in
(Press Ctrl+g to toggle between English and the chosen language)

Comments

Show Similar Question And Answers
QA->Which river has the largest drainage basin?....
QA->Which is India’s first corporate-run train that is slated to run from Lucknow to Delhi on October 4, 2019?....
QA->n the first 10 overs of a cricket game, the run rate was only What should be the run rate in the remaining 40 overs to reach the target of 282 runs?....
QA->In the first 10 overs of a cricket game, the run rate was only What should be the run rate in the remaining 40 overs to reach the target of 282 runs?....
QA->Which company will flag-off the country’s first non-Indian Railways run passenger train between Lucknow and Delhi on October 4, offering passengers, better amenities and a refund of 100 if the ₹ train is late by an hour?....
MCQ->Consider the following statements: An aqueduct is a cross drainage work in which (a) a canal is carried over the drainage channel (b) a drainage channel is carried over the canal (c) both drainage channel and canal are at the same level. Which of the statements given above is/are correct ?....
MCQ->Which two statements are true for any concrete class implementing the java.lang.Runnable interface? You can extend the Runnable interface as long as you override the public run() method. The class must contain a method called run() from which all code for that thread will be initiated. The class must contain an empty public void method named run(). The class must contain a public void method named runnable(). The class definition must include the words implements Threads and contain a method called run(). The mandatory method must be public, with a return type of void, must be called run(), and cannot take any arguments.....
MCQ->An intense rain is falling at a uniform rate of 7.5 cm/hour for a period of 60 minutes on a basin whose areas is 500 hectares. If the average infiltration capacity during the entire rain period is assumed to be 1.5 cm/hr, the maximum run-off rate based on 10 minute peak percentage of 16% from distributing graph of the basin, is....
MCQ->The run off a drainage basin is....
MCQ->If the axial length of a drainage basin is 35 km and its form factor is 0.2, the total area of the basin is....
Terms And Service:We do not guarantee the accuracy of available data ..We Provide Information On Public Data.. Please consult an expert before using this data for commercial or personal use | Powered By:Omega Web Solutions
© 2002-2017 Omega Education PVT LTD...Privacy | Terms And Conditions
Question ANSWER With Solution