1. The expected discharge to be obtained from an open well sunk in coarse sand is 0.0059 cumec. If the working depression head of the well is 3 m, the minimum diameter of the well, is






Ask Your Doubts Here

Type in
(Press Ctrl+g to toggle between English and the chosen language)

Comments

Show Similar Question And Answers
QA->In an examination of mathematics Rajesh obtained more marks than the total marks obtained by Rahim and Sabu. The total marks obtained by Rahim and Saji was more than the Rajesh’s. Rajesh obtained more marks than Saji, Reenu obtained more marks than Rajesh. Who amongst them obtained the....
QA->What is known in the names of ‘Singing sand, Whistling sand and Barking sand’ ?....
QA->A can complete a work in 12 days with a working of 8 hours per day. B can complete the same work in 8 days when working 10 hours a day. If A and B work together, working 8 hours a day, the work can be completed in --days.....
QA->Which was a white terrorist gang working in America during the period of Great Depression ?....
QA->From which the cathode ray particles originate in a discharge tube?....
MCQ->The expected discharge to be obtained from an open well sunk in coarse sand is 0.0059 cumec. If the working depression head of the well is 3 m, the minimum diameter of the well, is....
MCQ->If the specific capacity of a well is 0.3183 x 10-3 per sec, the discharge from a well of 4 m diameter under a depression head of 4 m, is....
MCQ->In an examination of mathematics Rajesh obtained more marks than the total marks obtained by Rahim and Sabu. The total marks obtained by Rahim and Saji was more than the Rajesh’s. Rajesh obtained more marks than Saji, Reenu obtained more marks than Rajesh. Who amongst them obtained the highest marks?....
MCQ->Statements:Some bricks are stones. Some stones are rocks. All rocks are clay. No clay is sand. Conclusions: I.Some stones are clay. II.Some bricks are sand. III.Some rocks are sand. IV.No brick is sand.....
MCQ->A hydraulic model of a spillway is constructed with a scale 1 : 16. If the prototype discharge is 2048 cumec, then the corresponding discharge for which the model should be tested is....
Terms And Service:We do not guarantee the accuracy of available data ..We Provide Information On Public Data.. Please consult an expert before using this data for commercial or personal use | Powered By:Omega Web Solutions
© 2002-2017 Omega Education PVT LTD...Privacy | Terms And Conditions
Question ANSWER With Solution