What is known as a watertight enclosure made up of sheet pile walls,usually temporary,built around a working area for the purpose of excluding water during construction? ?->(Show Answer!)
Question Set

1. What is known as a watertight enclosure made up of sheet pile walls,usually temporary,built around a working area for the purpose of excluding water during construction?





Ask Your Doubts Here

Type in
(Press Ctrl+g to toggle between English and the chosen language)

Comments

Show Similar Question And Answers
QA->A can complete a work in 12 days with a working of 8 hours per day. B can complete the same work in 8 days when working 10 hours a day. If A and B work together, working 8 hours a day, the work can be completed in --days.....
QA->A garden is 90 m long and 75m broad.A path 5 m wide is to be built outside around it. Find the area of the path:....
QA->A temporary storage area attached to the CPU of the computer for inputoutput operations is a....
QA->Which is the Excluding the moon the celestial object the appear brightest in the sky?....
QA->A small enclosure for cattle, sheep, poultry etc....
MCQ->What is known as a watertight enclosure made up of sheet pile walls,usually temporary,built around a working area for the purpose of excluding water during construction?....
MCQ->Consider the following statements pertaining to a pile group and a single pile at failure : 1. In loose and medium dense sands, the failure load per pile in a group will generally be greater than the failure load for a single pile. 2. In cohesive soils, the failure load per pile in a group will be greater than failure load for a single pile. 3. For piles driven in dense sands, the failure load per pile in a group is greater than the failure load for a single pile. 4. When the pile spacing is greater than 10 times the pile diameter, the failure loads per pile in a group and forly same in both sands and clays. Of these statements :....
MCQ->The temporary enclosure constructed in a river for excluding water during construction:....
MCQ->Consider the following field tests : 1. Vertical pile load test 2. Cyclic pile load test 3. Lateral pile load test 4. Instrumented test pile While estimating the load carrying capacity of a pile, the tests that can be used for separating the skin resistance from point resistance, would include....
MCQ->Two piles, one a bored cast-in-situ pile and another a precast driven pile, both of same length and diameter are constructed in a loose sand deposit. If the bearing capacity of the bored pile is Q1, and that of the precast driven pile is Q2, then which of the following is correct ?....
Terms And Service:We do not guarantee the accuracy of available data ..We Provide Information On Public Data.. Please consult an expert before using this data for commercial or personal use | Powered By:Omega Web Solutions
© 2002-2017 Omega Education PVT LTD...Privacy | Terms And Conditions
Question ANSWER With Solution