Warning: implode(): Invalid arguments passed in /www/wwwroot/jobquiz.info/mdiscuss.php on line 336
In sheet metal blanking,shear is provided on punches and dies so that ?->(Show Answer!)
Question Set

1. In sheet metal blanking,shear is provided on punches and dies so that





Ask Your Doubts Here

Type in
(Press Ctrl+g to toggle between English and the chosen language)

Comments

Show Similar Question And Answers
QA->A metal sheet with circular hole is heated. what change will be in the hole?....
QA->A metal sheet with a circular hole is heated. The hole will?....
QA->If a non-metal is added to the interstitial sites of a metal, then the metal becomes?....
QA->22. Pull one's punches....
QA->Decrease of viscosity with increasing shear rate is known as....
MCQ->In sheet metal blanking,shear is provided on punches and dies so that....
MCQ->In sheet metal blanking, shear is provided on punches and dies so that....
MCQ->The simplest method of welding two pieces of metal together is known as pressure welding.The ends of a metal are heated to a white heat-for iron,the welding temperature should be about 1300C-in a flame.At this temperature the metal becomes plastic.The ends are pressed or hammered together,and the joint is smoothed off.Care must be taken to ensure that surfaces are thoroughly clean first,for dirt will weaken the weld.Moreover,the heating of iron or steel to a high temperature cause oxidation,and a film of oxide is added to the heated surfaces.For this reason,flux is applied to the heated metal.At welding heat,flux melts and the oxide particles are dissolved in it together with any other impurities which may be present.The metal surfaces are pressed together,and the flux is squeezed out from the center of the weld.A number of different types of weld may be used,but for fairly thick bars of metals,a vee-shaped belt should be normally employed.It is rather stronger than ordinary butt weld. The simplest way of welding two pieces of metal together is....
MCQ->The time required for horizontal blanking is 16% of that for each horizontal line. If horizontal time is 63.5 μs, the horizontal blanking time for each line is about....
MCQ->A 25 cm x 25 cm x 1 cm flat sheet weighing 1.2 kg initially was dried from both sides under constant drying rate conditions. It took 1500 seconds for the weight of the sheet to reduce to 1.05 kg. Another 1m x 1m x 1cm flat sheet of the same material is to be dried from one side only.Under the same constant drying rate conditions, the time required for drying (in seconds) from its initial weight of 19.2 kg to 17.6 kg is....
Terms And Service:We do not guarantee the accuracy of available data ..We Provide Information On Public Data.. Please consult an expert before using this data for commercial or personal use | Powered By:Omega Web Solutions
© 2002-2017 Omega Education PVT LTD...Privacy | Terms And Conditions
Question ANSWER With Solution