Warning: implode(): Invalid arguments passed in /www/wwwroot/jobquiz.info/mdiscuss.php on line 336
Arrangement of RBC in pile of coins is called: ?->(Show Answer!)
Question Set

1. Arrangement of RBC in pile of coins is called:





Ask Your Doubts Here

Type in
(Press Ctrl+g to toggle between English and the chosen language)

Comments

Show Similar Question And Answers
QA->An arrangement of elements with similar properties placed together is called?....
QA->Spatial arrangement of components of radiant energy in order of their wavelengths is called....
QA->The abnormal rise in total count of RBC is called?....
QA->To make a pile....
QA->Which mountain pass of the Himalayas has the literal meaning of ‘Pile of Corpses’ due to people dying in bad weather trying to cross the pass ?....
MCQ->Consider the following statements pertaining to a pile group and a single pile at failure : 1. In loose and medium dense sands, the failure load per pile in a group will generally be greater than the failure load for a single pile. 2. In cohesive soils, the failure load per pile in a group will be greater than failure load for a single pile. 3. For piles driven in dense sands, the failure load per pile in a group is greater than the failure load for a single pile. 4. When the pile spacing is greater than 10 times the pile diameter, the failure loads per pile in a group and forly same in both sands and clays. Of these statements :....
MCQ->Consider the following field tests : 1. Vertical pile load test 2. Cyclic pile load test 3. Lateral pile load test 4. Instrumented test pile While estimating the load carrying capacity of a pile, the tests that can be used for separating the skin resistance from point resistance, would include....
MCQ->Arrangement of RBC in pile of coins is called:....
MCQ->Two piles, one a bored cast-in-situ pile and another a precast driven pile, both of same length and diameter are constructed in a loose sand deposit. If the bearing capacity of the bored pile is Q1, and that of the precast driven pile is Q2, then which of the following is correct ?....
MCQ->In testing a pile by load test, pile platform is loaded with one and half times the design load and a maximum settlement is noted. The load is gradually removed and the consequent rebound is measured. For a safe pile, the net settlement (i.e. total settlement minus rebound) per tonne of test load should not exceed....
Terms And Service:We do not guarantee the accuracy of available data ..We Provide Information On Public Data.. Please consult an expert before using this data for commercial or personal use | Powered By:Omega Web Solutions
© 2002-2017 Omega Education PVT LTD...Privacy | Terms And Conditions
Question ANSWER With Solution