Warning: implode(): Invalid arguments passed in /www/wwwroot/jobquiz.info/mdiscuss.php on line 336 A hydraulic model of a spill way is constructed with a scale 1:If the prototype discharge is 3125 cumec,then the corresponding discharge for which the model should be tested is: ?->(Show Answer!)
1. A hydraulic model of a spill way is constructed with a scale 1:If the prototype discharge is 3125 cumec,then the corresponding discharge for which the model should be tested is: