Toggle navigation
Home
KPSC Previous Question Papers
Article Category
kerala psc
upsc
General
Popular Pages
Multiple Choice Question in non-verbal-reasoning-grouping-of-images
Multiple Choice Question in aptitude-compound-interest
Multiple Choice Question in aptitude-area
Multiple Choice Question in engineering-mechanics-kinetics-of-a-particle-impulse-and-momentum
Multiple Choice Question in database-database-redesign
Question Answer in malayalam-kerala-psc-questions
Multiple Choice Question in malayalam-kerala-psc-questions
Multiple Choice Question in 035/2016
Multiple Choice Question in current-affairs-2017-03-05
Multiple Choice Question in electronic-devices-bipolar-junction-transistors
Question Answer in Malayalam General Knowledge
Question Answer Bank
Multiple Choice Question Bank
Question Answer Category
Multiple Choice Question Category
Home
->
Multiple Choice Questions
Question Set
electronics and communication engineering communication systems
1. Coupling and bypass filters can be a source of
(A): carrier frequency parasitics
(B): high-frequency parasitics
(C): low-frequency parasitics
(D): none of the above
Previous Question
Show Answer
Next Question
Add Tags
Report Error
Show Marks
Ask Your Doubts Here
Type in
(Press Ctrl+g to toggle between English and the chosen language)
Post reply
Comments
Show Similar Question And Answers
QA->P can do a work in the same time in which Q and R together can do it. If P and Q work together, the work can be completed in 10 days. R alone needs 50 days to complete the same work. then Q alone can do it in....
QA->A and B can do a work in 10 days, B and C can do it in 12 days, C and A can do it in 15 days. If A, B, and C work together, they will complete the work in:....
QA->A and B can do a work in 10 days. B and C can do it in 12 days. C and A can do it in 15 days. If A, B, and C work together, then the work will complete....
QA->P,Q and R together earn Rs.1620 in 9 days. P and R can earn Rs.600 in 5 days. Q and R in 7 days can earn Rs. How much amount does R can earn per day?....
QA->P can do a work in 24 days. Q can do the same work in 9 days and R can do the same in 12 days. Q and R start the work and leave after 3 days. P finishes the remaining work in --- days.....
MCQ->Coupling and bypass filters can be a source of....
MCQ->For which of the following frequency region(s) can the coupling and bypass capacitors no longer be replaced by the short-circuit approximation?....
MCQ->If the efficiencies of BOD removal of first-stage and second-stage trickling filters are each 65.0%, then what is the overall BOD removal efficiency of these filters ?....
MCQ->Cartridge filters are termed as 'edge' filters, because of the fact that the....
MCQ->The following characteristics pertain to the sand filters used in water industry. Filtration rate is 1 to 4 m3 (m2 day).Typical duration of operation in one run is 24 to 72 hours.Operating cost is low. Which of the above characteristics pertain to slow sand filters ?....
×
×
Type The Issue
×
Your Marks
Terms And Service:We do not guarantee the accuracy of available data ..We Provide Information On Public Data.. Please consult an expert before using this data for commercial or personal use | Powered By:Omega Web Solutions
© 2002-2017 Omega Education PVT LTD...
Privacy
|
Terms And Conditions
Question ANSWER With Solution