Toggle navigation
Home
KPSC Previous Question Papers
Article Category
kerala psc
upsc
General
Popular Pages
Multiple Choice Question in aptitude-area
Multiple Choice Question in non-verbal-reasoning-grouping-of-images
Multiple Choice Question in aptitude-compound-interest
Multiple Choice Question in engineering-mechanics-kinetics-of-a-particle-impulse-and-momentum
Multiple Choice Question in database-database-redesign
Multiple Choice Question in 035/2016
Question Answer in malayalam-kerala-psc-questions
Multiple Choice Question in malayalam-kerala-psc-questions
Multiple Choice Question in current-affairs-2017-03-05
Multiple Choice Question in electronic-devices-bipolar-junction-transistors
Question Answer in Malayalam General Knowledge
Question Answer Bank
Multiple Choice Question Bank
Question Answer Category
Multiple Choice Question Category
Home
->
Multiple Choice Questions
Question Set
general knowledge general science
1. Carbon, diamond and graphite are together called
(A): allotropes
(B): isomers
(C): isomorphs
(D): isotopes
Previous Question
Show Answer
Next Question
Add Tags
Report Error
Show Marks
Ask Your Doubts Here
Type in
(Press Ctrl+g to toggle between English and the chosen language)
Post reply
Comments
Show Similar Question And Answers
QA->What are Carbon; diamond and graphite together called?....
QA->What are Carbon, diamond and graphite together called?....
QA->Carbon, diamond and graphite are together called?....
QA->A and B can do a work in 12 days B and C together can do it in 15 days and C and A together in 20 days. If A,B,C work together, they will complete the work in?....
QA->P and Q need 8 days to complete a work. Q and R need 12 days to complete the same work. But P, Q and R together can finish it in 6 days. How man D. 4 days will be needed if P and R together do it?....
MCQ->Carbon, diamond and graphite are together called?....
MCQ->Carbon, diamond and graphite are together called....
MCQ->In how many days can B alone complete the work A,B, and C together can complete the work in 4 32/37 days. A and B together can complete the work in 6 2/3 days, B and C together can complete the work together in 8 2/11 days and A and C together can complete the work in 7 1/3 days.....
MCQ->The simplest method of welding two pieces of metal together is known as pressure welding.The ends of a metal are heated to a white heat-for iron,the welding temperature should be about 1300C-in a flame.At this temperature the metal becomes plastic.The ends are pressed or hammered together,and the joint is smoothed off.Care must be taken to ensure that surfaces are thoroughly clean first,for dirt will weaken the weld.Moreover,the heating of iron or steel to a high temperature cause oxidation,and a film of oxide is added to the heated surfaces.For this reason,flux is applied to the heated metal.At welding heat,flux melts and the oxide particles are dissolved in it together with any other impurities which may be present.The metal surfaces are pressed together,and the flux is squeezed out from the center of the weld.A number of different types of weld may be used,but for fairly thick bars of metals,a vee-shaped belt should be normally employed.It is rather stronger than ordinary butt weld. The simplest way of welding two pieces of metal together is....
MCQ->If A, B and C working together can do a job in 10 days. If A and C together can do it in 20 days and B and C together can do it in 15 days. If A and B work together, the number of days required to complete it is.....
×
×
Type The Issue
×
Your Marks
Terms And Service:We do not guarantee the accuracy of available data ..We Provide Information On Public Data.. Please consult an expert before using this data for commercial or personal use | Powered By:Omega Web Solutions
© 2002-2017 Omega Education PVT LTD...
Privacy
|
Terms And Conditions
Question ANSWER With Solution