1. What is the name for the group of men who elect a Pope?

Answer: College of Cardinals

Reply

Type in
(Press Ctrl+g to toggle between English and the chosen language)

Comments

Show Similar Question And Answers
QA->What is the name for the group of men who elect a Pope?....
QA->St. Peters Basilica in Rome was built under the patronage of Pope Julius II and Pope Leo X It was designed by?....
QA->6 men and 8 women can complete a work in 10 days. 26 men and 48 women can finish the same work in 2 days. 15 men and 20 women can do the same work in - days.....
QA->If 16 men or 20 women can do a piece of work in 25 days. In how many days can 28 men and 15 women can do the same work?....
QA->2 men and 6 boys can do in 4 days a piece of work which would be done again in 4 days by 4 men and 3 boys. One man will do it in—....
MCQ->You are the network administrator for your company. Mike Nash is a member of the Administration group, and Nate Sun is a member of the Intern group. Both groups are in the same domain. On the intranet server, the Administration group is placed in the Security group, and the Intern group is placed in the Nonsecurity group. The Security group is then granted Full Control permission for the Sales virtual directory. Nate needs to update new sales information that is located on the Sales virtual directory. What should you do so that Nate can perform this task?...
MCQ->8 men and 14 women are working together in a field. After working for 3 days, 5 men and 8 women leave the work. How many more days will be required to complete the work? I.  19 men and 12 women together can complete the work in 18 days. II.  16 men can complete two-third of the work in 16 days.  III.  In 1 day, the work done by three men in equal to the work done by four women....
MCQ->Statements: All men are vertebrates. Some mammals are vertebrates. Conclusions: All men are mammals. All mammals are men. Some vertebrates are mammals. All vertebrates are men.

...
MCQ->If 9 men working 71/2 hours a day can finish a piece of work in 20days, then how many days will be taken by 12 men, working 6 hours a day to finish the work? It is being given that 2 men of latter type work as much as 3 men of the former type?...
MCQ->Consider the following statements pertaining to a pile group and a single pile at failure : 1. In loose and medium dense sands, the failure load per pile in a group will generally be greater than the failure load for a single pile. 2. In cohesive soils, the failure load per pile in a group will be greater than failure load for a single pile. 3. For piles driven in dense sands, the failure load per pile in a group is greater than the failure load for a single pile. 4. When the pile spacing is greater than 10 times the pile diameter, the failure loads per pile in a group and forly same in both sands and clays. Of these statements :...
Terms And Service:We do not guarantee the accuracy of available data ..We Provide Information On Public Data.. Please consult an expert before using this data for commercial or personal use | Powered By:Omega Web Solutions
© 2002-2017 Omega Education PVT LTD...Privacy | Terms And Conditions
Question ANSWER With Solution