1. The following characteristics pertain to the sand filters used in water industry. Filtration rate is 1 to 4 m3 (m2 day).Typical duration of operation in one run is 24 to 72 hours.Operating cost is low. Which of the above characteristics pertain to slow sand filters ?





Ask Your Doubts Here

Type in
(Press Ctrl+g to toggle between English and the chosen language)

Comments

Show Similar Question And Answers
QA->A can complete a work in 12 days with a working of 8 hours per day. B can complete the same work in 8 days when working 10 hours a day. If A and B work together, working 8 hours a day, the work can be completed in --days.....
QA->Slow sand or biological filtration of water is introduced in Scotland in....
QA->A can do a piece of work in 4 hours . A and C together can do it in just 2 hours, while B and C together need 3 hours to finish the same work. B alone can complete the work in --- hours.....
QA->n the first 10 overs of a cricket game, the run rate was only What should be the run rate in the remaining 40 overs to reach the target of 282 runs?....
QA->In the first 10 overs of a cricket game, the run rate was only What should be the run rate in the remaining 40 overs to reach the target of 282 runs?....
MCQ->The following characteristics pertain to the sand filters used in water industry. Filtration rate is 1 to 4 m3 (m2 day).Typical duration of operation in one run is 24 to 72 hours.Operating cost is low. Which of the above characteristics pertain to slow sand filters ?....
MCQ->Duration along the critical path defines which of the following ? 1. Shortest duration needed 2. Shortest duration permissible 3. Longest duration needed 4. Longest duration permissible Select the correct answer using the code given below :....
MCQ->Chemical engineering plant cost index is used for finding the present cost of a particular chemical plant, if the cost of similar plant at some time in the past is known. the present cost of the plant = Original cost [index value at present / index value at the time of original cost was obtained] The most major component of this cost index is....
MCQ->The basic filtration equation is given as where, V is volume of the filtrate ; A is the filtration area, a is specific cake resistance, μ is viscosity of the filtrate, and C is the concentration of the solids in the feed slurry. In a 20 minutes constant rate filtration, 5 m3 of filtrate was obtained. If this is followed by a constant pressure filtration, how much more time in minutes, it will take for another 5 m3 of filtrate to be produced ? Neglect filter medium resistance, Rm ; assume incompressible cake.....
MCQ->The normal duration and normal cost of an activity are 10 days and Rs 350/- respectively. The cost slope is Rs 75/- per day. If the crash duration is 8 days, then what is the crash cost of the activity ?....