Warning: implode(): Invalid arguments passed in /www/wwwroot/jobquiz.info/mdiscuss.php on line 336 A portion of an embankment having a uniform up-gradient 1 in 500 is circular with radius 1000 m of the centre line.It subtends 1800 at the centre.If the height of the bank is 1m at the lower end,and side slopes 2:1,the earth work involved: ?->(Show Answer!)
1. A portion of an embankment having a uniform up-gradient 1 in 500 is circular with radius 1000 m of the centre line.It subtends 1800 at the centre.If the height of the bank is 1m at the lower end,and side slopes 2:1,the earth work involved: