Warning: implode(): Invalid arguments passed in /www/wwwroot/jobquiz.info/mdiscuss.php on line 336 A portion of embankment having a uniform up gradient of 1 in 500 is circular with a radius of 1000 m of the centre line.It subtends 1800at the centre.If the height of the embankment is 1 m at the lower end and side slope is 2:1,the earth work involve ?->(Show Answer!)
1. A portion of embankment having a uniform up gradient of 1 in 500 is circular with a radius of 1000 m of the centre line.It subtends 1800at the centre.If the height of the embankment is 1 m at the lower end and side slope is 2:1,the earth work involved is