Question Set

1. Allowable slump for concrete used for road work is---------





Ask Your Doubts Here

Type in
(Press Ctrl+g to toggle between English and the chosen language)

Comments

Show Similar Question And Answers
QA->It is more difficult to walk on a sandy road than on a concrete road because?....
QA->P and Q can do a work in 30 days. Q and R can do the same work in 24 days and R and P in 20 days. They started the work together, but Q and R left after 10 days. How many days more will P take to finish the work?....
QA->P and Q can complete a work in 15 days and 10 days respectively. They started the work together and then Q left after 2 days. P alone completed the remaining work. The work was finished in --- days.....
QA->A can complete a work in 12 days with a working of 8 hours per day. B can complete the same work in 8 days when working 10 hours a day. If A and B work together, working 8 hours a day, the work can be completed in --days.....
QA->P and Q can complete a work in 20 days and 12 days respectively. P alone started the work and Q joined him after 4 days till the completion of the work. How long did the work last?....
MCQ->Allowable slump for concrete used for road work is---------....
MCQ->Consider the following statements about conditions that make a metal semiconductor contact rectifying N type semiconductor with work function φs more than work function φM of metalN type semiconductor with work function φs less than work function φM of metalP type semiconductor with work function φs more than work function φM of metalP type semiconductor with work function φs less than work function φM of metal. Of these statements....
MCQ->Consider the following statements : For an over-reinforced (singly reinforced) rectangular RC section. 1. the lever arm will be less than that for a balanced section. 2. the maximum stress developed by steel would equal the allowable stress in steel. 3. the maximum stress developed by concrete would equal allowable stress in concrete. Of these statements :....
MCQ->Consider the following statements regarding use of mechanical vibrator : 1. It can be used for small as well as large volumes of concrete. 2. The mix can have high value of slump. 3. Density of concrete can be high. The advantages of a mechanical vibrator include :....
MCQ->For the supply of materials for concrete, form work reinforcing and placing of concrete, removal of form work and curing of concrete, number of bar(s) required on bar chart, is....
Terms And Service:We do not guarantee the accuracy of available data ..We Provide Information On Public Data.. Please consult an expert before using this data for commercial or personal use | Powered By:Omega Web Solutions
© 2002-2017 Omega Education PVT LTD...Privacy | Terms And Conditions
Question ANSWER With Solution