1. In big automobile repair shop, for elevating and moving the heavy parts such as complete engine assembly, gear box etc., an overhead crane and a fork lift truck is used.



Ask Your Doubts Here

Type in
(Press Ctrl+g to toggle between English and the chosen language)

Comments

Show Similar Question And Answers
QA->In an automobile gear transmission the counter shaft drive gear is meshed with the gear on the:....
QA->3 men and 7 women can complete a work in 10 days . But 4 men and 6 women need 8 days to complete the same work . In how many days will 10 women complete the same work?....
QA->10 men can complete a work in 7 days. But 10 women7 need 14 days to complete the same work. How many days will 5 men and 10 women need to complete the work?....
QA->A man started to walk East. After moving a distance he turned to his right. After moving a distance he turned to his right again. After moving a little he turned in the end of his left. In which direction he going is now?....
QA->Method of lubrication in a gear box is....
MCQ->In big automobile repair shop, for elevating and moving the heavy parts such as complete engine assembly, gear box etc., an overhead crane and a fork lift truck is used.....
MCQ->In February 2014, the number of paperback editions sold by shop D was 5% more than the same sold by the same shop in the previous month. The number of paperback editions sold in February 2014 by shop D constituted 75% of the total number of books sold by shop D in February 2014. What was the total number of books sold in February 2014 by shop D....
MCQ->The crane provides a long-reach capacity by using the telescopic boom segment DE. The entire boom is supported by a pin at A and by the telescopic hydraulic cylinder BC, which can be considered as a two-force member. The rated load capacity of the crane is measured by a maximum force developed in the hydraulic cylinder. If this maximum force is developed when the boom supports a mass m = 6 Mg and its length is l = 40 and = 60°, determine the greatest mass that can be supported when the boom length is extended to l = 50 m and = 45°. Neglect the weight of the boom and the size of the pulley at E. Assume the crane does not overturn. Note: when = 60° BC is vertical; however, when = 45° this is not the case.....
MCQ->The speed of a car is twice that of a truck. Both started from Palakkadu and reached at Salem. If the truck took 3 hours more than the car, what was the time taken by the truck to reach at Salem?....
MCQ->The speed of a car is twice that of truck.Both started from Palakkadu and reached at Salem.If the truck took 3 hours more than the car,what was the time taken by the truck to reach at Salem?....
Terms And Service:We do not guarantee the accuracy of available data ..We Provide Information On Public Data.. Please consult an expert before using this data for commercial or personal use | Powered By:Omega Web Solutions
© 2002-2017 Omega Education PVT LTD...Privacy | Terms And Conditions
Question ANSWER With Solution