1. In a nut and bolt, the diameter at which the ridges on the bolt are in complete touch with the ridges of the corresponding nut, is called pitch diameter.



Ask Your Doubts Here

Type in
(Press Ctrl+g to toggle between English and the chosen language)

Comments

Show Similar Question And Answers
QA->3 men and 7 women can complete a work in 10 days . But 4 men and 6 women need 8 days to complete the same work . In how many days will 10 women complete the same work?....
QA->10 men can complete a work in 7 days. But 10 women7 need 14 days to complete the same work. How many days will 5 men and 10 women need to complete the work?....
QA->P and Q need 8 days to complete a work. Q and R need 12 days to complete the same work. But P, Q and R together can finish it in 6 days. How man D. 4 days will be needed if P and R together do it?....
QA->A and B together can do a piece of work in 12 days and A alone can complete the work in 18 days.How long will B alone take to complete the job?....
QA->If a graph is plotted taking the temperature in Fahrenheit along the Y-axis and the corresponding temperature in Celsius along X- axis it will be the straight line?....
MCQ->In a nut and bolt, the diameter at which the ridges on the bolt are in complete touch with the ridges of the corresponding nut, is called pitch diameter.....
MCQ->When a bolt and nut is made of mild steel, then the effective height of nut is made equal to (where d = Nominal diameter of bolt)....
MCQ->In a sawn nut, a slot is cut about half way through the nut and a small screw is tightened between the nut and the bolt in order to produce more friction.....
MCQ->If P1 is the initial tension due to tightening up the bolt and P2 is the external load on the bolt, then the resultant load (P) on a bolt may be obtained by using the relation (where a = Ratio of elasticity of connected parts to the elasticity of bolt)....
MCQ->In how many days can B alone complete the work A,B, and C together can complete the work in 4 32/37 days. A and B together can complete the work in 6 2/3 days, B and C together can complete the work together in 8 2/11 days and A and C together can complete the work in 7 1/3 days.....
Terms And Service:We do not guarantee the accuracy of available data ..We Provide Information On Public Data.. Please consult an expert before using this data for commercial or personal use | Powered By:Omega Web Solutions
© 2002-2017 Omega Education PVT LTD...Privacy | Terms And Conditions
Question ANSWER With Solution