72651. Slack represents the difference between the
72652. Acceptance sampling is used in
72653. Queuing theory is used for
72654. The transfer of capital to Devagiri from Delhi by Mohammad-bin-Tughlaq had one good effect. What is that?
72655. Break even point is the point where
72656. In a thermal power plant, coal from the coal handling plant is moved to the boiler bunker through a
72657. When slack of an activity is positive
72658. For a small scale industry, the fixed cost per month is Rs. 5000. The variable cost per product is Rs. 20 and sales price is Rs. 30 per piece. The break even production per month will be
72659. Follow-up prescribes the sequence of operations to be followed.
72660. Dummy activities are used to
72661. Select the one which best expresses the same sentence in passive voice: A friend of ours is repairing the roof?
72662. The coldest planet is?
72663. CPM stands for
72664. The average time recorded by work study man for an operation is called
72665. In value engineering, important consideration is given to
72666. The unit cost in case of batch production is __________ as compared to jobbing production.
72667. The old man was too weak to travel ......... himself.?
72668. PERT is applied for
72669. The most important function of inventory control is
72670. Break even analysis represents the relationship between cost and volume.
72671. In product layout
72672. The bonus increases in proportion to the increase in efficiency. This statement applies to
72673. Which of the following statement is correct about the network diagram?
72674. P.M.T.S. (Predetermined Motion Time Systems) include
72675. In jobbing production
72676. Performance rating is equal to
72677. In perpetual inventory control, the material is checked as it reaches its
72678. In process layout
72679. A feasible solution to the linear programming problem should
72680. Abbreviated work factor data is applied for
72681. Routing
72682. Which of the following conditions are necessary for applying linear programming?
72683. Indirect expenses include
72684. A dummy activity becomes a critical activity when its earliest start time (EST) is same as its latest finishing time (LFT).
72685. In time study, normal time is more than the standard time.
72686. The start or completion of task is called
72687. Monte Carlo solution in queuing theory is extremely useful in queuing problems that can not be analysed mathematically.
72688. A-B-C analysis
72689. The process capability of a machine is defined as the capability of the machine to
72690. Service time in queuing theory is usually assumed to follow
72691. At the break even point,
72692. An activity of the project is graphically represented by __________ on the network diagram.
72693. According to Rowan plan of wage incentive system, bonus is paid to a worker
72694. Which of the following charts are used for plant layout design?
72695. Earliest finish time can be regarded as
72696. If (R) is the base rate guaranteed per hour, (S) is the standard time for the job and (T) is the actual time, then according to Halsey 50-50 plan, wages for the job will be
72697. The time taken by a trained worker to perform an operation, while working a steady pace, is known as
72698. Normal time is the ratio of representative time to the rating factor.
72699. According to Muther, the basic principle of best layout is
72700. Time study is carried out to determine the time required to complete job by