72601. In A-B-C analysis, which class of items are generally large in number?
72602. Simplex method is the method used for
72603. Dispatching
72604. Which of the following wage incentive plan guarantees minimum wage to a worker and bonus is paid for the fixed percentage of time saved?
72605. Job evaluation is the method of determining the
72606. The routing function in a production system design is concerned with
72607. In big automobile repair shop, for elevating and moving the heavy parts such as complete engine assembly, gear box etc., an overhead crane and a fork lift truck is used.
72608. Direct expenses include
72609. String diagram is used
72610. Which of the following type of layout is suitable for automobile manufacturing concern?
72611. Representative time is the average of times recorded by work study man for an operation.
72612. Queuing theory is associated with
72613. PERT requires
72614. Gradual decline of towns was an important feature of the?
72615. The product layout is more amenable to automation than process layout.
72616. In break even analysis, total cost consists of
72617. A critical activity has
72618. Sampling method of determining standard time is profitable for long cycle operation.
72619. Break even analysis is a
72620. In a functional organisation
72621. The purpose of micromotion study is to
72622. A PERT network has three activities on critical path with mean time 3, 8 and 6 and standard deviations 1, 2 and 2 respectively. The probability that the project will be completed in 20 days is
72623. Scheduling
72624. F. W. Taylor introduced a system of organisation known as
72625. The correct sequence of phases in value engineering is
72626. Micromotion study is
72627. Valve analysis is particularly of interest when
72628. The type of layout used for manufacturing steam turbines, is
72629. For material transportation, conveyors are used when the prevailing conditions include
72630. The planning and scheduling of job order manufacturing differ from planning and scheduling of mass production manufacturing.
72631. Gantt chart gives information about
72632. Merit rating is the method of determining the
72633. PERT stands for
72634. In Emerson's efficiency plan of wage incentive system, bonus is paid to a worker
72635. M.T.M. is used to
72636. A dummy activity in a net work diagram
72637. The production scheduling is simpler and high volume of output and high labour efficiency are achieved in the case of
72638. Standard time is equal to
72639. In inventory control, the economic ordering quantity is obtained by the quantity whose procurement cost is equal to inventory carrying cost.
72640. The essential condition for the decompression of an activity is that
72641. Time study is carried out
72642. Two alternatives can produce a product. First has a fixed cost of Rs. 2000 and a variable cost of Rs. 20 per piece. The second method has a fixed cost of Rs. 1500 and a variable cost of Rs. 30. The break even quantity between the two alternatives is
72643. Which of the following are the principles of material handling?
72644. The product layout
72645. An event is a function of two or more activities.
72646. The mathematical technique for finding the best use of limited resources of a company in the maximum manner is known as
72647. The factors to be considered for production scheduling are