26401. Modular co-ordination of construction means proper
26402. Bat tab settings inserts a -----------in your document at the tab stops.
26403. If t is the duration of an activity, t1 is the latest finish possible moment of its preceding activity and t2 is the earliest start possible moment, the independent float of the activity is
26404. Open Office is an example of:
26405. For the supply of materials for concrete, form work reinforcing and placing of concrete, removal of form work and curing of concrete, number of bar(s) required on bar chart, is
26406. For the execution of a project, a contractor is
26407. Railway projects are treated as
26408. From the following,which is an example of free software:
26409. The critical activity has
26410. The main disadvantage of line organisation, is
26411. Malayalam typewriter keyboard was designed by:
26412. Pre-tender stage requires
26413. The final selection of a construction site, is done by
26414. Minimum number of copies available in the print dialog box:
26415. The first stage of a construction, is
26416. PERT is
26417. Residential buildings are treated as
26418. The main advantage of line organisation, is :
26419. PERT analysis is based on
26420. For completion of a project, the critical path of the network represents
26421. In CPM analysis,
26422. A goiden rule for the procurement of construction stones, suggests
26423. Power stations are generally treated as
26424. An event is indicated on the network by a number enclosed in
26425. How many spaces would be left after exclamatory mark(!)?
26426. While scheduling a project by C.P.M.
26427. Pick up the correct statement from the following with regards to C.P.M. network analysis of projects
26428. How many shift systems are present in a typewriter?
26429. Which one of the following represents an event ?
26430. From the below,which part of a typewriter requires oiling:
26431. For the network shown in the given figure, the expected time for the activity
26432. Frequency distribution curves
26433. What is “I”in iOS?
26434. The three time estimates for the activities of the network shown in the given figure are shown above their arrows. The earliest expected time for the event 4, is
26435. Optimistic time, most likely time and pessimistic times for the activities of a network in the given figure are written above their arrows. If the contractual obligation time for the project is 75, the latest occurrence time for the event 2, is
26436. While filling the tender for any work, the contractor considers
26437. Which one of the following represents an activity
26438. The third generation computers mainly used:
26439. The technique for establishing and maintaining priorities among the various jobs of a project, is known
26440. Mile Stone charts were invented in the year of
26441. Frederick W. Taylor introduced a system of working known as
26442. The Planning Commission of India is replaced by:
26443. In word processing,red underline indicates:
26444. Who was the first Viceroy of independent India?
26445. The Indian National Leader who participated in 3 Round Table Conferences:
26446. Chepauk Stadium is situated in:
26447. Who among the following is appointed as the Goodwill Ambassador of UNICEF,South Asian Zone?
26448. Which among the following diseases is also known as”Pink Eye”?
26449. A low wall built out into the sea more or less perpendicular to the coast line, to resist the travel of sand and shingle along a beach, is called
26450. At a place the shore line is along North West-South East. The wind is blowing from the north. The littoral drift will be along