Question Set

1. During Kanishka's reign, the centre of political activity shifted from Magadha to?





Ask Your Doubts Here

Type in
(Press Ctrl+g to toggle between English and the chosen language)

Comments

Show Similar Question And Answers
QA->A political party will be treated as recognised in a State only if it has been engaged in Political activity for a continuous period of __ years.?....
QA->A Buddhist Council during the reign of Kanishka was held at which place?....
QA->Who presided over the Buddhist Council held during the reign of Kanishka at Kashmir?....
QA->The Hajur Katcheri of Travancore was shifted from Kollam to Thiruvananthapuram during the reign of?....
QA->During the period of Swati Tirunal, the Hajur Kacheri (Secretariat) of Travancore was shifted to Thiruvananthapuram from?....
MCQ->During Kanishka's reign, the centre of political activity shifted from Magadha to?....
MCQ->Consider the following statements relating to the stability of floating as well as submerged bodies : 1. A submerged body is stable when the centre of gravity is below the centre of buoyancy. 2. A floating body is stable when the centre of gravity is above the centre of buoyancy. 3. A floating body is stable when the centre of gravity is below the metacentre. 4. A submerged body is in stable equilibrium when the centre of gravity coincides with the centre of buoyancy. Of these statements :....
MCQ->Under which of the following circumstances an elected member of Parliament may be disqualified on the ground of defection:1. If he voluntarily gives up his membership of a political party. 2. If he votes or abstains from voting contrary to any direction issued by his political party without prior permission of the political party. 3. If he speaks against the political party. 4. If he joins a political party other than the party on whose ticket he contested and got elected.?....
MCQ->In drawing AOA networks and making time computations, the following processes are involved : 1. Activity listing 2. Work breakdown structure 3. Activity time allotment 4. Consideration of available resources for each activity 5. Activity dependencies 6. Float computations 7. Backward path computation 8. Project duration 9. Forward path computation What is the correct sequence of the processes given above ?....
MCQ->Consider the following statements : 1. A dummy activity is artificially introduced in a network when necessary. 2. A dummy activity consumes some time. 3. A dummy activity is represented by a dotted arrow. 4. A dummy activity must necessarily be introduced in every network. Which of the above statements are correct ?....
Terms And Service:We do not guarantee the accuracy of available data ..We Provide Information On Public Data.. Please consult an expert before using this data for commercial or personal use | Powered By:Omega Web Solutions
© 2002-2017 Omega Education PVT LTD...Privacy | Terms And Conditions
Question ANSWER With Solution