1. Which of the following conditions must be satisfied for lift force to be developed ?





Ask Your Doubts Here

Type in
(Press Ctrl+g to toggle between English and the chosen language)

Comments

Show Similar Question And Answers
QA->A simple pendulum is set up inside a lift. The period of oscillations is maximum when the lift is:?....
QA->That which can not be satisfied....
QA->The first of the 15 Chinook heavy lift helicopters ordered by the Indian Air Force (IAF) arrived in India on February 10, 2019. From which country India has purchased these helicopters?....
QA->The first set of four Chinook heavy lift helicopters was inducted in Indian Air Force on March 25, 2019. From which country India procured these helicopters?....
QA->Minimum speed which a body must have to escape from the earth's gravitational force is called?....
MCQ->Which of the following conditions must be satisfied for lift force to be developed ?....
MCQ->Statement: Please do not use lift while going down - an instruction on the top floor of a five-storey building. Assumptions: While going down, the lift is unable to carry any load. Provision of lift is a matter of facility and not of right.

....
MCQ->Which two statements are true for any concrete class implementing the java.lang.Runnable interface? You can extend the Runnable interface as long as you override the public run() method. The class must contain a method called run() from which all code for that thread will be initiated. The class must contain an empty public void method named run(). The class must contain a public void method named runnable(). The class definition must include the words implements Threads and contain a method called run(). The mandatory method must be public, with a return type of void, must be called run(), and cannot take any arguments.....
MCQ->To configure the VLAN trunking protocol to communicate VLAN information between two switches, what two requirements must be met? Each end of the trunk link must be set to the IEEE 802.1e encapsulation. The VTP management domain name of both switches must be set the same. All ports on both the switches must be set as access ports. One of the two switches must be configured as a VTP server. A rollover cable is required to connect the two switches together. A router must be used to forward VTP traffic between VLANs.....
MCQ->The crane provides a long-reach capacity by using the telescopic boom segment DE. The entire boom is supported by a pin at A and by the telescopic hydraulic cylinder BC, which can be considered as a two-force member. The rated load capacity of the crane is measured by a maximum force developed in the hydraulic cylinder. If this maximum force is developed when the boom supports a mass m = 6 Mg and its length is l = 40 and = 60°, determine the greatest mass that can be supported when the boom length is extended to l = 50 m and = 45°. Neglect the weight of the boom and the size of the pulley at E. Assume the crane does not overturn. Note: when = 60° BC is vertical; however, when = 45° this is not the case.....
Terms And Service:We do not guarantee the accuracy of available data ..We Provide Information On Public Data.. Please consult an expert before using this data for commercial or personal use | Powered By:Omega Web Solutions
© 2002-2017 Omega Education PVT LTD...Privacy | Terms And Conditions
Question ANSWER With Solution