Toggle navigation
Home
KPSC Previous Question Papers
Article Category
kerala psc
upsc
General
Popular Pages
Multiple Choice Question in aptitude-area
Multiple Choice Question in non-verbal-reasoning-grouping-of-images
Multiple Choice Question in aptitude-compound-interest
Multiple Choice Question in engineering-mechanics-kinetics-of-a-particle-impulse-and-momentum
Multiple Choice Question in electronic-devices-bipolar-junction-transistors
Multiple Choice Question in 035/2016
Multiple Choice Question in database-database-redesign
Question Answer in malayalam-kerala-psc-questions
Multiple Choice Question in malayalam-kerala-psc-questions
Multiple Choice Question in current-affairs-2017-03-05
Question Answer in KERALA PSC
Multiple Choice Question in KERALA PSC
Question Answer Bank
Multiple Choice Question Bank
Question Answer Category
Multiple Choice Question Category
Home
->
Multiple Choice Questions
Question Set
civil engineering upsc civil service exam questions
1. A catchment has an area of 150 hectares and a run-off/rainfall ratio of 0.40. If due to 10 cm rainfall over the catchment, a stream flow at the catchment outlet lasts for 10 hours, what is the average stream flow in the period ?
(A): 1.33 m3/s
(B): 100 m3/minute
(C): 3.5 m3/s
(D): 60, 000 m3/hour
Previous Question
Show Answer
Next Question
Add Tags
Report Error
Show Marks
Ask Your Doubts Here
Type in
(Press Ctrl+g to toggle between English and the chosen language)
Post reply
Comments
Show Similar Question And Answers
QA->A can do a piece of work in 4 hours . A and C together can do it in just 2 hours, while B and C together need 3 hours to finish the same work. B alone can complete the work in --- hours.....
QA->The ratio of bases of a cylinder and a cone are in the ratio 3: Volume of cylinder and cone are in the ratio 9: then their heights are in the ratio?....
QA->A can do a piece of work in 4 hours . A and C together can do it in just 2 hours, while B and C together need 3 hours to finish the same work. B alone can complete the work in --- days.....
QA->Raj can do a piece of work in 5 hours. Hari and Siva can do it in 3 hours. Raj and Siva can do it in 4 hours. How long will Hari take to do it ?....
QA->Raj can do a piece of work in 5 hours. Hari and Siva can do it in 3 hours. Raj and Siva can do it in 4 hours. How long will Hari take to do it ?....
MCQ->A catchment has an area of 150 hectares and a run-off/rainfall ratio of 0.40. If due to 10 cm rainfall over the catchment, a stream flow at the catchment outlet lasts for 10 hours, what is the average stream flow in the period ?....
MCQ->If intensity of rainfall in cm per hour is I, percentage coefficient of run-off is P, area of catchment in square kilometres is A, the total run-off Q, is given by....
MCQ->The drainage area of a town is 12 hectares. Its 40% area is hard pavement (K = 0.85), the 40% area is unpaved streets (K = 0.20) and the remaining is wooded areas (K = 0.15). Assuming the time of concentration for the areas as 30 minutes and using the formula the maximum run off is....
MCQ->An intense rain is falling at a uniform rate of 7.5 cm/hour for a period of 60 minutes on a basin whose areas is 500 hectares. If the average infiltration capacity during the entire rain period is assumed to be 1.5 cm/hr, the maximum run-off rate based on 10 minute peak percentage of 16% from distributing graph of the basin, is....
MCQ->Solve the following equation for x, y, and z:x y + z = 1 x + y + z = 1 x + 2y 2z = 5....
×
×
Type The Issue
×
Your Marks
Terms And Service:We do not guarantee the accuracy of available data ..We Provide Information On Public Data.. Please consult an expert before using this data for commercial or personal use | Powered By:Omega Web Solutions
© 2002-2017 Omega Education PVT LTD...
Privacy
|
Terms And Conditions
Question ANSWER With Solution