Warning: implode(): Invalid arguments passed in /www/wwwroot/jobquiz.info/mdiscuss.php on line 336
The critical path in PERT is determined on the basis of: ?->(Show Answer!)
Question Set

1. The critical path in PERT is determined on the basis of:





Ask Your Doubts Here

Type in
(Press Ctrl+g to toggle between English and the chosen language)

Comments

Show Similar Question And Answers
QA->A garden is 90 m long and 75m broad.A path 5 m wide is to be built outside around it. Find the area of the path:....
QA->The length of a park is 50m and the breadth is 35m. The width of a path running around the park is 5m. Find the area of the path?....
QA->Who is the author of “India- The Critical years”?....
QA->Who is the author of “ India- The Critical years”?....
QA->By which number the quality of gasoline’ sample is determined?....
MCQ->What does the critical path in PERT represent ? 1. The shortest path for the earliest completion of the project. 2. The longest path of the network from the initial to final event,....
MCQ->The critical path in PERT is determined on the basis of:....
MCQ->In a laboratory test run, the rate of drying was found to be 0.5 x 10-3 kg/m2.s, when the moisture content reduced from 0.4 to 0.1 on dry basis. The critical moisture content of the material is 0.08 on a dry basis. A tray dryer is used to dry 100 kg (dry basis) of the same material under identical conditions. The surface area of the material is 0.04 m2/kg of dry solid. The time required (in seconds) to reduce the moisture content of the solids from 0.3 to 0.2 (dry basis) is....
MCQ->Which three statements are true? Assertion checking is typically enabled when a program is deployed. It is never appropriate to write code to handle failure of an assert statement. Assertion checking is typically enabled during program development and testing. Assertion checking can be selectively enabled or disabled on a per-package basis, but not on a per-class basis. Assertion checking can be selectively enabled or disabled on both a per-package basis and a per-class basis.....
MCQ->In PERT, the actual time duration along the critical path for the project completion time is probabilistic. It is usually presumed to follow which one of the following ?....
Terms And Service:We do not guarantee the accuracy of available data ..We Provide Information On Public Data.. Please consult an expert before using this data for commercial or personal use | Powered By:Omega Web Solutions
© 2002-2017 Omega Education PVT LTD...Privacy | Terms And Conditions
Question ANSWER With Solution