1. A pre-tensioned concrete member of section 200 mm x 250 mm contains tendons of area 500 mm2 at centre of gravity of the section. The prestress in the tendons is 1000 N/mm2. Assuming modular ratio as 10, the stress (N/mm2) in concrete is





Ask Your Doubts Here

Type in
(Press Ctrl+g to toggle between English and the chosen language)

Comments

Show Similar Question And Answers
QA->The ratio of bases of a cylinder and a cone are in the ratio 3: Volume of cylinder and cone are in the ratio 9: then their heights are in the ratio?....
QA->The length and breadth of a rectangular field in the ratio of 12: 7 . Find the length if area of the field is 52,500 Sq.m?....
QA->250 വൈദ്യുതിയിൽ പ്രവർത്തിക്കുന്ന 750 വാട്ട് അയൺ ബോക്സ് 2 മണിക്കുർ പ്രവർത്തിക്കുന്നു . അതേ വൈദ്യുതിയിൽ പ്രവർത്തിക്കുന്ന 500 വാട്ട്ഫാൻ, 3 മണിക്കുർ പ്രവർത്തിക്കുന്നു. ഇതിൽ ഏത് ഉപകരണമാണ് കൂടുതൽ ഊർജം ഉപയോയോഗിക്കുന്നത്? ....
QA->200 രൂപ വിലയുള്ള ഒരു വാച്ച് 250 രൂപക്ക് വിറ്റപ്പോൾ ലാഭ ശതമാനം ?....
QA->ഇന്ത്യയിൽ 2016 ൽ 500; 1000 രൂപാ നോട്ടുകൾ അസാധുവാക്കിയ ദിവസം?....
MCQ->A pre-tensioned concrete member of section 200 mm x 250 mm contains tendons of area 500 mm2 at centre of gravity of the section. The prestress in the tendons is 1000 N/mm2. Assuming modular ratio as 10, the stress (N/mm2) in concrete is....
MCQ->Consider the following statements relating to the stability of floating as well as submerged bodies : 1. A submerged body is stable when the centre of gravity is below the centre of buoyancy. 2. A floating body is stable when the centre of gravity is above the centre of buoyancy. 3. A floating body is stable when the centre of gravity is below the metacentre. 4. A submerged body is in stable equilibrium when the centre of gravity coincides with the centre of buoyancy. Of these statements :....
MCQ->In a pre-stressed concrete beam of span 6 m and section 300 mm x 500 mm,the pre-stressing tendons are located along the longitudinal centroidal axis,with an effective pres-stressing force of 900kN.If the beam is subjected to a uniformly distributed load of 15 kN/m including the self weight of the beam,the top and bottom extreme fibre stresses in concrete at the mid span section are respectively....
MCQ->The losses in prestress in pre-tensioning system are due to : 1. elastic deformation of concrete when wires are tensioned successively 2. friction 3. shrinkage and creep of concrete Select the correct answer using the codes given below:....
MCQ->If a concrete column 200 x 200 mm in cross-section is reinforced with four steel bars of 1200 mm2 total cross-sectional area. Calculate the safe load for the column if permissible stress in concrete is 5 N/mm2 and Es is 15 Ec....