1. Traffic census is carried out for






Ask Your Doubts Here

Type in
(Press Ctrl+g to toggle between English and the chosen language)

Comments

Show Similar Question And Answers
QA->Name the Operation carried out by Army to flush out six terrorist at Pathankot ( പാത്തന് ‍ ക്കോട്ട് ) airbase recently...?....
QA->The year and place in which Pakistan carried out five nuclear tests is?....
QA->The construction of Old Secretariat complex was carried out by?....
QA->Wine production is mainly carried out in natural region?....
QA->The first explosion of an atomic device in India was carried out in which state?....
MCQ->Which of the following data would be required for the design of progressive type computerised traffic signal system in a series of intersection on a busy street ? 1. Volume of fast moving traffic 2. Volume of pedestrain traffic 3. Volume of slow traffic 4. Approach speed of fast moving traffic. Select the correct answer using the codes given below :....
MCQ->Statement: In spite of the heavy rains the traffic has not been disrupted this year. Assumptions: The traffic is disrupted in rainy seasons only. Rains do not affect traffic movement. Adequate precautions were taken for traffic management during rainy season.

....
MCQ->Traffic census is carried out for....
MCQ->A two lane single carriage-way is to be designed for a design life period of 15 years. Total two-way traffic intensity in the year of completion of construction is expected to be 2000 commercial vehicles per day. Vehicle damage factor = 3.0, Lane distribution factor = 0.75. Assuming an annual rate of traffic growth as 7.5%, the design traffic expressed as cumulative number of standard axles, is....
MCQ->It is proposed to widen and strengthen an existing 2-lane NH section as a divided highway. The existing traffic in one direction is 2500 commercial vehicles (CV) per day. The construction will take 1 year. The design CBR of soil subgrade is found to be 5 percent, Given: traffic growth rate for CV = 8 percent, vehicle damage factor = 3.5 (standard axles per CV), design life = 10 years and traffic distribution factor = 0.75. The cumulative standard axles (msa) computed are....
Terms And Service:We do not guarantee the accuracy of available data ..We Provide Information On Public Data.. Please consult an expert before using this data for commercial or personal use | Powered By:Omega Web Solutions
© 2002-2017 Omega Education PVT LTD...Privacy | Terms And Conditions
Question ANSWER With Solution