51. PERT is
all the above. an analytic in concept based on three time estimates for activities linking up two events limited of event oriented diagrams used for research and development projects
Disscuss This Question & Answer Add Tags Report Error Show Marks
52. Residential buildings are treated as
heavy construction industrial construction light construction private construction.
Disscuss This Question & Answer Add Tags Report Error Show Marks
53. The main advantage of line organisation, is :
ability of quick decision at all levels all the above. defined responsibilities at all levels effective command and control rigid discipline in the organisation
Disscuss This Question & Answer Add Tags Report Error Show Marks
54. PERT analysis is based on
all the above. most likely time optimistic time pessimistic time
Disscuss This Question & Answer Add Tags Report Error Show Marks
55. For completion of a project, the critical path of the network represents
maximum cost maximum time minimum cost. minimum time
Disscuss This Question & Answer Add Tags Report Error Show Marks
56. In CPM analysis,
activities are represented by arrows all the above. beginning and end of an activity, are denoted by nodes emphasis is given to activities uncertainties are not allowed
Disscuss This Question & Answer Add Tags Report Error Show Marks
57. A goiden rule for the procurement of construction stones, suggests
100% at the site 33% at the site and 67% under procurement 50% at the site and 50% under procurement 67% at the site and 33% under procurement none of these.
Disscuss This Question & Answer Add Tags Report Error Show Marks
58. Power stations are generally treated as
electrical construction. heavy construction industrial construction light construction
Disscuss This Question & Answer Add Tags Report Error Show Marks
59. An event is indicated on the network by a number enclosed in
a circle a square a triangle all the above. an ellipse
Disscuss This Question & Answer Add Tags Report Error Show Marks
60. While scheduling a project by C.P.M.
a project is divided into various activities All the above. net work is drawn by connecting the activities and the events required time for each activity is established sequence of various activities is made according to their importance
Disscuss This Question & Answer Add Tags Report Error Show Marks
61. Pick up the correct statement from the following with regards to C.P.M. network analysis of projects
All the above. Earliest occurrence time of the event from which the activity arrow originates plus the duration of the activity, is called earliest finish time of the activity The latest occurrence time for the node at which the activity arrow terminates, is called latest finish time The latest occurrence time of the node of which the activity arrow terminates minus the duration of the activity, is called latest start time
Disscuss This Question & Answer Add Tags Report Error Show Marks
62. Which one of the following represents an event ?
all the above. concrete cured fixing of door plastering of walls selecting sites
Disscuss This Question & Answer Add Tags Report Error Show Marks
63. For the network shown in the given figure, the expected time for the activity
1-2 is 4 2-3 is 7 3-4 is 8 all the above.
Disscuss This Question & Answer Add Tags Report Error Show Marks
64. Frequency distribution curves
all the above. having a single lump, are called uninodal curves if not symmetrical, are called skew curves if symmetrical, are called normal curves
Disscuss This Question & Answer Add Tags Report Error Show Marks
65. The three time estimates for the activities of the network shown in the given figure are shown above their arrows. The earliest expected time for the event 4, is
14 19 24 None of these.
Disscuss This Question & Answer Add Tags Report Error Show Marks
66. Optimistic time, most likely time and pessimistic times for the activities of a network in the given figure are written above their arrows. If the contractual obligation time for the project is 75, the latest occurrence time for the event 2, is
15 20 25 35
Disscuss This Question & Answer Add Tags Report Error Show Marks
67. While filling the tender for any work, the contractor considers
all the above. availability of construction materials availability of labour site survey study of specifications
Disscuss This Question & Answer Add Tags Report Error Show Marks
68. Which one of the following represents an activity
all the above. curing of concrete excavation for foundation preparation of breakfast setting of question paper
Disscuss This Question & Answer Add Tags Report Error Show Marks
69. The technique for establishing and maintaining priorities among the various jobs of a project, is known
Critical ratio scheduling Event flow scheduling technique Short interval scheduling. Slotting technique for scheduling
Disscuss This Question & Answer Add Tags Report Error Show Marks
71. Frederick W. Taylor introduced a system of working known as
effective organisation. functional organisation line and staff organisation line organisation
Disscuss This Question & Answer Add Tags Report Error Show Marks