1. India's First Underwater Metro Tunnel connect which of the following cities?





Ask Your Doubts Here

Type in
(Press Ctrl+g to toggle between English and the chosen language)

Comments

  • By: guest on 01 Jun 2017 11.10 pm
    A gigantic Tunnel Boring Machine is being used to build a underwater tunnel in the river Hooghly which connect Howrah with Kolkata. The tunnels are being dug at a depth of 30 metres below the earth's surface and 13 metres below the riverbed. The 520-metre tunnels under the river are part of the 10.8 km underground stretch.
Show Similar Question And Answers
QA->The first underwater rail tunnel in India is constructed under which river ?....
QA->Which metro is recently declared as World`s first Green Metro ?....
QA->Through which Strait; does a tunnel connect the United Kingdom and France?....
QA->Through which Strait, does a tunnel connect the United Kingdom and France?....
QA->India’s first district cooling system will come up in which of the following cities?....
MCQ->India's First Underwater Metro Tunnel connect which of the following cities?....
MCQ->The following tunnels were constructed in different countries for different purposes : 1. Emperor Claudius built the first Roman tunnel 2. The first highway tunnel was constructed in Hungary 3. The first underground railway tunnel was constructed in Great Britain 4. The first navigational tunnel was constructed in France. The correct chronological development of these tunnels is:....
MCQ->India's first underwater tunnel connect which two cities?....
MCQ->Statement : Launching of new brands of four wheelers is adding to the trafficcongestion in the metro cities.Courses of action :I. Public should be encouraged to share their private vehicles while travelling to theirwork places.II. Govt. should levy heavy taxes on motor cars in metro cities.....
MCQ->The "Back sight" reading on a vertically held staff at a point A on the floor along the centre line of a railway tunnel is 3.465 m, and the "Fore sight" on the inverted staff held at the roof of the tunnel just vertically above A is 1.115 m. The height of the tunnel along the centre line at floor point A is....
Terms And Service:We do not guarantee the accuracy of available data ..We Provide Information On Public Data.. Please consult an expert before using this data for commercial or personal use | Powered By:Omega Web Solutions
© 2002-2017 Omega Education PVT LTD...Privacy | Terms And Conditions
Question ANSWER With Solution