29. In order to avoid excessive multiplication of facilities, the layout preferred is
30. In A-B-C analysis, which class of items are generally large in number?
31. Simplex method is the method used for
32. Dispatching
33. Which of the following wage incentive plan guarantees minimum wage to a worker and bonus is paid for the fixed percentage of time saved?
34. Job evaluation is the method of determining the
35. The routing function in a production system design is concerned with
36. In big automobile repair shop, for elevating and moving the heavy parts such as complete engine assembly, gear box etc., an overhead crane and a fork lift truck is used.
37. Direct expenses include
38. String diagram is used
39. Which of the following type of layout is suitable for automobile manufacturing concern?
40. Representative time is the average of times recorded by work study man for an operation.
41. Queuing theory is associated with
42. PERT requires
43. The product layout is more amenable to automation than process layout.
44. In break even analysis, total cost consists of
45. A critical activity has
46. Sampling method of determining standard time is profitable for long cycle operation.
47. Break even analysis is a
48. In a functional organisation
49. The purpose of micromotion study is to
50. A PERT network has three activities on critical path with mean time 3, 8 and 6 and standard deviations 1, 2 and 2 respectively. The probability that the project will be completed in 20 days is