126. An application program in the development software package that controls the operation of the software is called a ________.
127. Most complex digital designs include ________.
128. Using a hardware solution for a digital system is always ________ than a software solution.
129. The programming technologies that are used in FPGA devices include SRAM, flash, and antifuse, with ________ being the most common.
130. A method for the automated testing of printed circuit boards is called a(n) ________.
131. In a MAX7000S device, when an I/O pin is configured as an input, the associated macrocell can be used for ________.
132. The process or sequence of all operations carried out to ultimately program a target device is called the ________.
133. Full custom ICs can operate at ________ and require the ________.
134. Gated arrays are ________ circuits that offer hundreds of thousands of gates.
135. The MAX+PLUS II compiler will automatically program a macrocell to borrow up to ________ product terms from each of the 3 adjacent macrocells in the same LAB.
136. A complex programmable logic device that consists of multiple SPLD arrays with programmable interconnections is called a ________.
137. Design costs for standard cell ASICs are ________ those for MPGAs.
138. The ________ can generate any possible logic function of the input variables because it generates every possible AND product term.
139. The EPM 7128S is a(n) ________ device.
140. The distinction between CPLDs and FPGAs is ________.
141. ________ is a mature technology consisting of numerous subfamilies that have been developed over many years of use.
142. The flexibility of the GAL16V8 is in its ________.
143. The field programmable logic array was the first ________ programmable logic device.
144. The GAL16V8 has architecture that is very similar to the ________ device.
145. In a GAL16V8, the D flip-flops contained in the OLMCs have ________ and ________.
146. In a programmable logic device circuit diagram, the inputs to each of the OR gates are designated by ________.
147. The SPLD classification includes the ________ PLD devices.
148. In the MAX7000S device up to ________ signals can feed each LAB from the PIA.
149. FLEX10K devices are generally classified as ________.
150. The major structures in the MAX7000S are the ________ and ________.